An inventory data-driven model for predictive-reactive production scheduling.

Saved in:
Bibliographic Details
Title: An inventory data-driven model for predictive-reactive production scheduling.
Authors: Takeda-Berger, Satie L.1 (AUTHOR) satietakeda@hotmail.com, Frazzon, Enzo M.1 (AUTHOR)
Source: International Journal of Production Research. May2024, Vol. 62 Issue 9, p3059-3083. 25p.
Subjects: Production scheduling, Inventories, Machine learning, Key performance indicators (Management), Industry 4.0
Abstract: Scheduling is a complex task due to the need to optimise multiple competing objectives and react to unpredictable events that may occur during production execution. The strategy of predictive-reactive scheduling can be used to reconcile the conflict between the original schedule and the current shop floor situation. This study seeks to present an inventory data-driven predictive-reactive production scheduling model that supports the evolving concepts of the Industry 4.0. Periodically, a machine learning technique provides predictive scheduling considering a best-case scenario according to an established Key Performance Indicator (KPI). Then, material non-availability causes disruptions in production, which triggers the Simulation-Based Optimization (SBO) method to handle these events. Thus, SBO provides a reactive schedule with the best set of priority rules to sequence jobs on each machine according to the data on the shop floor. This model was validated with a real case study using data collected from a metal-mechanical company. Considering the service level KPI, the results showed that the model is able to find a better solution in the compared scenarios. Therefore, even in a dynamic and stochastic scenario, with machine breakdowns, quality problems, raw material delays, and accuracy issues, the model proved efficient in mitigating these variations' effects. [ABSTRACT FROM AUTHOR]
Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
Full text is not displayed to guests.
FullText Links:
  – Type: pdflink
Text:
  Availability: 1
Header DbId: egs
DbLabel: Engineering Source
An: 176294426
AccessLevel: 6
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: An inventory data-driven model for predictive-reactive production scheduling.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Takeda-Berger%2C+Satie+L%2E%22">Takeda-Berger, Satie L.</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> satietakeda@hotmail.com</i><br /><searchLink fieldCode="AR" term="%22Frazzon%2C+Enzo+M%2E%22">Frazzon, Enzo M.</searchLink><relatesTo>1</relatesTo> (AUTHOR)
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22International+Journal+of+Production+Research%22">International Journal of Production Research</searchLink>. May2024, Vol. 62 Issue 9, p3059-3083. 25p.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Production+scheduling%22">Production scheduling</searchLink><br /><searchLink fieldCode="DE" term="%22Inventories%22">Inventories</searchLink><br /><searchLink fieldCode="DE" term="%22Machine+learning%22">Machine learning</searchLink><br /><searchLink fieldCode="DE" term="%22Key+performance+indicators+%28Management%29%22">Key performance indicators (Management)</searchLink><br /><searchLink fieldCode="DE" term="%22Industry+4%2E0%22">Industry 4.0</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: Scheduling is a complex task due to the need to optimise multiple competing objectives and react to unpredictable events that may occur during production execution. The strategy of predictive-reactive scheduling can be used to reconcile the conflict between the original schedule and the current shop floor situation. This study seeks to present an inventory data-driven predictive-reactive production scheduling model that supports the evolving concepts of the Industry 4.0. Periodically, a machine learning technique provides predictive scheduling considering a best-case scenario according to an established Key Performance Indicator (KPI). Then, material non-availability causes disruptions in production, which triggers the Simulation-Based Optimization (SBO) method to handle these events. Thus, SBO provides a reactive schedule with the best set of priority rules to sequence jobs on each machine according to the data on the shop floor. This model was validated with a real case study using data collected from a metal-mechanical company. Considering the service level KPI, the results showed that the model is able to find a better solution in the compared scenarios. Therefore, even in a dynamic and stochastic scenario, with machine breakdowns, quality problems, raw material delays, and accuracy issues, the model proved efficient in mitigating these variations' effects. [ABSTRACT FROM AUTHOR]
– Name: AbstractSuppliedCopyright
  Label:
  Group: Ab
  Data: <i>Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=176294426
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.1080/00207543.2023.2217297
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 25
        StartPage: 3059
    Subjects:
      – SubjectFull: Production scheduling
        Type: general
      – SubjectFull: Inventories
        Type: general
      – SubjectFull: Machine learning
        Type: general
      – SubjectFull: Key performance indicators (Management)
        Type: general
      – SubjectFull: Industry 4.0
        Type: general
    Titles:
      – TitleFull: An inventory data-driven model for predictive-reactive production scheduling.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Takeda-Berger, Satie L.
      – PersonEntity:
          Name:
            NameFull: Frazzon, Enzo M.
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 05
              Text: May2024
              Type: published
              Y: 2024
          Identifiers:
            – Type: issn-print
              Value: 00207543
          Numbering:
            – Type: volume
              Value: 62
            – Type: issue
              Value: 9
          Titles:
            – TitleFull: International Journal of Production Research
              Type: main
ResultId 1