An inventory data-driven model for predictive-reactive production scheduling.
Saved in:
| Title: | An inventory data-driven model for predictive-reactive production scheduling. |
|---|---|
| Authors: | Takeda-Berger, Satie L.1 (AUTHOR) satietakeda@hotmail.com, Frazzon, Enzo M.1 (AUTHOR) |
| Source: | International Journal of Production Research. May2024, Vol. 62 Issue 9, p3059-3083. 25p. |
| Subjects: | Production scheduling, Inventories, Machine learning, Key performance indicators (Management), Industry 4.0 |
| Abstract: | Scheduling is a complex task due to the need to optimise multiple competing objectives and react to unpredictable events that may occur during production execution. The strategy of predictive-reactive scheduling can be used to reconcile the conflict between the original schedule and the current shop floor situation. This study seeks to present an inventory data-driven predictive-reactive production scheduling model that supports the evolving concepts of the Industry 4.0. Periodically, a machine learning technique provides predictive scheduling considering a best-case scenario according to an established Key Performance Indicator (KPI). Then, material non-availability causes disruptions in production, which triggers the Simulation-Based Optimization (SBO) method to handle these events. Thus, SBO provides a reactive schedule with the best set of priority rules to sequence jobs on each machine according to the data on the shop floor. This model was validated with a real case study using data collected from a metal-mechanical company. Considering the service level KPI, the results showed that the model is able to find a better solution in the compared scenarios. Therefore, even in a dynamic and stochastic scenario, with machine breakdowns, quality problems, raw material delays, and accuracy issues, the model proved efficient in mitigating these variations' effects. [ABSTRACT FROM AUTHOR] |
| Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Engineering Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| FullText | Links: – Type: pdflink Text: Availability: 1 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 176294426 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: An inventory data-driven model for predictive-reactive production scheduling. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Takeda-Berger%2C+Satie+L%2E%22">Takeda-Berger, Satie L.</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> satietakeda@hotmail.com</i><br /><searchLink fieldCode="AR" term="%22Frazzon%2C+Enzo+M%2E%22">Frazzon, Enzo M.</searchLink><relatesTo>1</relatesTo> (AUTHOR) – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22International+Journal+of+Production+Research%22">International Journal of Production Research</searchLink>. May2024, Vol. 62 Issue 9, p3059-3083. 25p. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22Production+scheduling%22">Production scheduling</searchLink><br /><searchLink fieldCode="DE" term="%22Inventories%22">Inventories</searchLink><br /><searchLink fieldCode="DE" term="%22Machine+learning%22">Machine learning</searchLink><br /><searchLink fieldCode="DE" term="%22Key+performance+indicators+%28Management%29%22">Key performance indicators (Management)</searchLink><br /><searchLink fieldCode="DE" term="%22Industry+4%2E0%22">Industry 4.0</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: Scheduling is a complex task due to the need to optimise multiple competing objectives and react to unpredictable events that may occur during production execution. The strategy of predictive-reactive scheduling can be used to reconcile the conflict between the original schedule and the current shop floor situation. This study seeks to present an inventory data-driven predictive-reactive production scheduling model that supports the evolving concepts of the Industry 4.0. Periodically, a machine learning technique provides predictive scheduling considering a best-case scenario according to an established Key Performance Indicator (KPI). Then, material non-availability causes disruptions in production, which triggers the Simulation-Based Optimization (SBO) method to handle these events. Thus, SBO provides a reactive schedule with the best set of priority rules to sequence jobs on each machine according to the data on the shop floor. This model was validated with a real case study using data collected from a metal-mechanical company. Considering the service level KPI, the results showed that the model is able to find a better solution in the compared scenarios. Therefore, even in a dynamic and stochastic scenario, with machine breakdowns, quality problems, raw material delays, and accuracy issues, the model proved efficient in mitigating these variations' effects. [ABSTRACT FROM AUTHOR] – Name: AbstractSuppliedCopyright Label: Group: Ab Data: <i>Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=176294426 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.1080/00207543.2023.2217297 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 25 StartPage: 3059 Subjects: – SubjectFull: Production scheduling Type: general – SubjectFull: Inventories Type: general – SubjectFull: Machine learning Type: general – SubjectFull: Key performance indicators (Management) Type: general – SubjectFull: Industry 4.0 Type: general Titles: – TitleFull: An inventory data-driven model for predictive-reactive production scheduling. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Takeda-Berger, Satie L. – PersonEntity: Name: NameFull: Frazzon, Enzo M. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 05 Text: May2024 Type: published Y: 2024 Identifiers: – Type: issn-print Value: 00207543 Numbering: – Type: volume Value: 62 – Type: issue Value: 9 Titles: – TitleFull: International Journal of Production Research Type: main |
| ResultId | 1 |