Choosing the right contract: probabilistic model.

Saved in:
Bibliographic Details
Title: Choosing the right contract: probabilistic model.
Authors: Stovin, Virginia1, Eccles, Stephen2, O'Reilly, Michael3
Source: Proceedings of the Institution of Civil Engineers. Civil Engineering. 2004, Vol. 157 Issue 2, p86-90. 5p.
Subjects: Civil engineering contracts, Cost, Contractors, Monte Carlo method, Estimation theory, Civil engineering
Abstract: The inherent risks of civil engineering projects mean the choice of contract can have a significant impact on cost and duration. In the absence of any quantitative comparisons, the decision tends to be based on qualitative criteria or personal preference — which may not result in the best solution either for the client or contractor Help is now at hand in the form of a spreadsheet-based, probabilistic model which uses a Monte Carlo simulation to plot the possible range of costs and durations associated with each type of contract. This paper shows how the model can be applied to a small tunnelling project making a comparison between fixed-priced and cost- plus-fixed-fee arrangements. The results are quite striking, showing the substantial potential cost savings offered by the cost-plus route in this case. [ABSTRACT FROM AUTHOR]
Copyright of Proceedings of the Institution of Civil Engineers. Civil Engineering is the property of Thomas Telford Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
FullText Text:
  Availability: 0
Header DbId: egs
DbLabel: Engineering Source
An: 18163738
AccessLevel: 6
PubType: Conference
PubTypeId: conference
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Choosing the right contract: probabilistic model.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Stovin%2C+Virginia%22">Stovin, Virginia</searchLink><relatesTo>1</relatesTo><br /><searchLink fieldCode="AR" term="%22Eccles%2C+Stephen%22">Eccles, Stephen</searchLink><relatesTo>2</relatesTo><br /><searchLink fieldCode="AR" term="%22O'Reilly%2C+Michael%22">O'Reilly, Michael</searchLink><relatesTo>3</relatesTo>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22Proceedings+of+the+Institution+of+Civil+Engineers%2E+Civil+Engineering%22">Proceedings of the Institution of Civil Engineers. Civil Engineering</searchLink>. 2004, Vol. 157 Issue 2, p86-90. 5p.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Civil+engineering+contracts%22">Civil engineering contracts</searchLink><br /><searchLink fieldCode="DE" term="%22Cost%22">Cost</searchLink><br /><searchLink fieldCode="DE" term="%22Contractors%22">Contractors</searchLink><br /><searchLink fieldCode="DE" term="%22Monte+Carlo+method%22">Monte Carlo method</searchLink><br /><searchLink fieldCode="DE" term="%22Estimation+theory%22">Estimation theory</searchLink><br /><searchLink fieldCode="DE" term="%22Civil+engineering%22">Civil engineering</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: The inherent risks of civil engineering projects mean the choice of contract can have a significant impact on cost and duration. In the absence of any quantitative comparisons, the decision tends to be based on qualitative criteria or personal preference — which may not result in the best solution either for the client or contractor Help is now at hand in the form of a spreadsheet-based, probabilistic model which uses a Monte Carlo simulation to plot the possible range of costs and durations associated with each type of contract. This paper shows how the model can be applied to a small tunnelling project making a comparison between fixed-priced and cost- plus-fixed-fee arrangements. The results are quite striking, showing the substantial potential cost savings offered by the cost-plus route in this case. [ABSTRACT FROM AUTHOR]
– Name: AbstractSuppliedCopyright
  Label:
  Group: Ab
  Data: <i>Copyright of Proceedings of the Institution of Civil Engineers. Civil Engineering is the property of Thomas Telford Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=18163738
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.1680/cien.2004.157.2.86
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 5
        StartPage: 86
    Subjects:
      – SubjectFull: Civil engineering contracts
        Type: general
      – SubjectFull: Cost
        Type: general
      – SubjectFull: Contractors
        Type: general
      – SubjectFull: Monte Carlo method
        Type: general
      – SubjectFull: Estimation theory
        Type: general
      – SubjectFull: Civil engineering
        Type: general
    Titles:
      – TitleFull: Choosing the right contract: probabilistic model.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Stovin, Virginia
      – PersonEntity:
          Name:
            NameFull: Eccles, Stephen
      – PersonEntity:
          Name:
            NameFull: O'Reilly, Michael
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 04
              Text: 2004
              Type: published
              Y: 2004
          Identifiers:
            – Type: issn-print
              Value: 0965089X
          Numbering:
            – Type: volume
              Value: 157
            – Type: issue
              Value: 2
          Titles:
            – TitleFull: Proceedings of the Institution of Civil Engineers. Civil Engineering
              Type: main
ResultId 1