Kostrzewa-Demczuk, P., & Rogalska, M. (2024). Scheduling with the Probabilistic Coupling Method II (PTCM II) - assuming continuity of work on the working sectors. Archives of Civil Engineering (Polish Academy of Sciences), 70(4), 505. https://doi.org/10.24425/ace.2024.151906
Chicago Style (17th ed.) CitationKostrzewa-Demczuk, Paulina, and Magdalena Rogalska. "Scheduling with the Probabilistic Coupling Method II (PTCM II) - Assuming Continuity of Work on the Working Sectors." Archives of Civil Engineering (Polish Academy of Sciences) 70, no. 4 (2024): 505. https://doi.org/10.24425/ace.2024.151906.
MLA (9th ed.) CitationKostrzewa-Demczuk, Paulina, and Magdalena Rogalska. "Scheduling with the Probabilistic Coupling Method II (PTCM II) - Assuming Continuity of Work on the Working Sectors." Archives of Civil Engineering (Polish Academy of Sciences), vol. 70, no. 4, 2024, p. 505, https://doi.org/10.24425/ace.2024.151906.