A graphical evaluation and review technique for scheduling construction projects.
Saved in:
| Title: | A graphical evaluation and review technique for scheduling construction projects. |
|---|---|
| Authors: | Pregina, K.1 (AUTHOR) pregina.k2020@vitstudent.ac.in, Kannan, M. Ramesh1 (AUTHOR) cemdse@gmail.com |
| Source: | Journal of Scheduling. Jun2025, Vol. 28 Issue 3, p311-328. 18p. |
| Subjects: | Critical path analysis, House construction, Construction projects, Delphi method, Network analysis (Planning) |
| Abstract: | Scheduling a construction project is a complex procedure since it entails several sequences of various jobs or activities that need to be finished within the allotted time frame. Additionally, identifying the factors that influence the construction schedule, such as the nature of construction operations, their duration, dependence relationships, and related probabilities of occurrence, presents challenges and ambiguities. Major construction projects have traditionally been scheduled using conventional project scheduling techniques, such as the programme evaluation and review technique (PERT) and critical path method (CPM), among others. However, these construction scheduling methods continue to be inadequate for identifying the essential elements needed to generate complete and precise schedules, highlighting the need for a more effective technique to overcome uncertainties and stochastic aspects of construction scheduling. To fully comprehend these inherent stochastic properties, the present study employs the Graphical Evaluation and Review Technique (GERT), a stochastic technique for project network analysis. While prior studies support the effectiveness of GERT in the pre-construction phase, there is a lack of investigation into its practical application within the domain of residential construction. The present investigation addresses this gap by demonstrating the effectiveness of GERT in scheduling real-time residential projects by conducting a systematic and comparative analysis of GERT, PERT, and CPM methodologies across various scales of residential structures. GERT is initially applied to schedule a real-time single-storey residential structure. The GERT schedule closely reflects the as-built schedule of the structure. In addition, GERT is utilised to schedule 45 construction projects in real time, further emphasising its relevance and applicability. The GERT-generated schedule for these projects is validated for correctness by comparing it to the actual project duration. The findings demonstrate the advantages of the proposed technique in comparison to existing methods. [ABSTRACT FROM AUTHOR] |
| Copyright of Journal of Scheduling is the property of Springer Nature and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Engineering Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| FullText | Links: – Type: pdflink Text: Availability: 1 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 185810635 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: A graphical evaluation and review technique for scheduling construction projects. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Pregina%2C+K%2E%22">Pregina, K.</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> pregina.k2020@vitstudent.ac.in</i><br /><searchLink fieldCode="AR" term="%22Kannan%2C+M%2E+Ramesh%22">Kannan, M. Ramesh</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> cemdse@gmail.com</i> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Journal+of+Scheduling%22">Journal of Scheduling</searchLink>. Jun2025, Vol. 28 Issue 3, p311-328. 18p. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22Critical+path+analysis%22">Critical path analysis</searchLink><br /><searchLink fieldCode="DE" term="%22House+construction%22">House construction</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+projects%22">Construction projects</searchLink><br /><searchLink fieldCode="DE" term="%22Delphi+method%22">Delphi method</searchLink><br /><searchLink fieldCode="DE" term="%22Network+analysis+%28Planning%29%22">Network analysis (Planning)</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: Scheduling a construction project is a complex procedure since it entails several sequences of various jobs or activities that need to be finished within the allotted time frame. Additionally, identifying the factors that influence the construction schedule, such as the nature of construction operations, their duration, dependence relationships, and related probabilities of occurrence, presents challenges and ambiguities. Major construction projects have traditionally been scheduled using conventional project scheduling techniques, such as the programme evaluation and review technique (PERT) and critical path method (CPM), among others. However, these construction scheduling methods continue to be inadequate for identifying the essential elements needed to generate complete and precise schedules, highlighting the need for a more effective technique to overcome uncertainties and stochastic aspects of construction scheduling. To fully comprehend these inherent stochastic properties, the present study employs the Graphical Evaluation and Review Technique (GERT), a stochastic technique for project network analysis. While prior studies support the effectiveness of GERT in the pre-construction phase, there is a lack of investigation into its practical application within the domain of residential construction. The present investigation addresses this gap by demonstrating the effectiveness of GERT in scheduling real-time residential projects by conducting a systematic and comparative analysis of GERT, PERT, and CPM methodologies across various scales of residential structures. GERT is initially applied to schedule a real-time single-storey residential structure. The GERT schedule closely reflects the as-built schedule of the structure. In addition, GERT is utilised to schedule 45 construction projects in real time, further emphasising its relevance and applicability. The GERT-generated schedule for these projects is validated for correctness by comparing it to the actual project duration. The findings demonstrate the advantages of the proposed technique in comparison to existing methods. [ABSTRACT FROM AUTHOR] – Name: AbstractSuppliedCopyright Label: Group: Ab Data: <i>Copyright of Journal of Scheduling is the property of Springer Nature and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=185810635 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.1007/s10951-024-00832-x Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 18 StartPage: 311 Subjects: – SubjectFull: Critical path analysis Type: general – SubjectFull: House construction Type: general – SubjectFull: Construction projects Type: general – SubjectFull: Delphi method Type: general – SubjectFull: Network analysis (Planning) Type: general Titles: – TitleFull: A graphical evaluation and review technique for scheduling construction projects. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Pregina, K. – PersonEntity: Name: NameFull: Kannan, M. Ramesh IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 06 Text: Jun2025 Type: published Y: 2025 Identifiers: – Type: issn-print Value: 10946136 Numbering: – Type: volume Value: 28 – Type: issue Value: 3 Titles: – TitleFull: Journal of Scheduling Type: main |
| ResultId | 1 |