Leveraging system-integrator for better wood supply chain coordination through advanced planning.

Saved in:
Bibliographic Details
Title: Leveraging system-integrator for better wood supply chain coordination through advanced planning.
Authors: Eboli, Pedro1 (AUTHOR) pedro.eboli-ribeiro-pecanha.1@ulaval.ca, Lebel, Luc1 (AUTHOR), Santa-Eulalia, Luis Antonio de2 (AUTHOR)
Source: International Journal of Production Research. Oct2025, Vol. 63 Issue 19, p7260-7277. 18p.
Subjects: Advanced planning & scheduling, Systems integrators, Cost control, Forest management, Decision making, Strategic sourcing, Operations research, Forest products industry
Abstract: Natural and extensively managed forests supply raw materials to a diversified forest industry, requiring close coordination among mills when sharing the same procurement areas. One approach to enhance procurement planning process is by employing a system-integrator, a third-party organisation responsible for collaborative, fair, and neutral planning within the supply chain. Advanced planning and scheduling tools employing Operations Research methods can significantly improve wood procurement planning performance. This study aims to quantitatively and qualitatively evaluate the benefits of advanced tools on system-integrator's decision-making. A Design Science Research approach was developed and tested with real data from a forest management company executing the annual procurement plan for 11 mills. Results indicate potential time reduction to harvest block selection and volume allocation, and transportation costs reduction by 15.44%, saving $2.16 per m³. Interviews with stakeholders confirmed that the proposed approach enhanced plan quality, planning process quality and system-integrator's roles and characteristics. [ABSTRACT FROM AUTHOR]
Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
Full text is not displayed to guests.
FullText Links:
  – Type: pdflink
Text:
  Availability: 1
Header DbId: egs
DbLabel: Engineering Source
An: 188316287
AccessLevel: 6
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Leveraging system-integrator for better wood supply chain coordination through advanced planning.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Eboli%2C+Pedro%22">Eboli, Pedro</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> pedro.eboli-ribeiro-pecanha.1@ulaval.ca</i><br /><searchLink fieldCode="AR" term="%22Lebel%2C+Luc%22">Lebel, Luc</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Santa-Eulalia%2C+Luis+Antonio+de%22">Santa-Eulalia, Luis Antonio de</searchLink><relatesTo>2</relatesTo> (AUTHOR)
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22International+Journal+of+Production+Research%22">International Journal of Production Research</searchLink>. Oct2025, Vol. 63 Issue 19, p7260-7277. 18p.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Advanced+planning+%26+scheduling%22">Advanced planning & scheduling</searchLink><br /><searchLink fieldCode="DE" term="%22Systems+integrators%22">Systems integrators</searchLink><br /><searchLink fieldCode="DE" term="%22Cost+control%22">Cost control</searchLink><br /><searchLink fieldCode="DE" term="%22Forest+management%22">Forest management</searchLink><br /><searchLink fieldCode="DE" term="%22Decision+making%22">Decision making</searchLink><br /><searchLink fieldCode="DE" term="%22Strategic+sourcing%22">Strategic sourcing</searchLink><br /><searchLink fieldCode="DE" term="%22Operations+research%22">Operations research</searchLink><br /><searchLink fieldCode="DE" term="%22Forest+products+industry%22">Forest products industry</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: Natural and extensively managed forests supply raw materials to a diversified forest industry, requiring close coordination among mills when sharing the same procurement areas. One approach to enhance procurement planning process is by employing a system-integrator, a third-party organisation responsible for collaborative, fair, and neutral planning within the supply chain. Advanced planning and scheduling tools employing Operations Research methods can significantly improve wood procurement planning performance. This study aims to quantitatively and qualitatively evaluate the benefits of advanced tools on system-integrator's decision-making. A Design Science Research approach was developed and tested with real data from a forest management company executing the annual procurement plan for 11 mills. Results indicate potential time reduction to harvest block selection and volume allocation, and transportation costs reduction by 15.44%, saving $2.16 per m³. Interviews with stakeholders confirmed that the proposed approach enhanced plan quality, planning process quality and system-integrator's roles and characteristics. [ABSTRACT FROM AUTHOR]
– Name: AbstractSuppliedCopyright
  Label:
  Group: Ab
  Data: <i>Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=188316287
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.1080/00207543.2025.2496974
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 18
        StartPage: 7260
    Subjects:
      – SubjectFull: Advanced planning & scheduling
        Type: general
      – SubjectFull: Systems integrators
        Type: general
      – SubjectFull: Cost control
        Type: general
      – SubjectFull: Forest management
        Type: general
      – SubjectFull: Decision making
        Type: general
      – SubjectFull: Strategic sourcing
        Type: general
      – SubjectFull: Operations research
        Type: general
      – SubjectFull: Forest products industry
        Type: general
    Titles:
      – TitleFull: Leveraging system-integrator for better wood supply chain coordination through advanced planning.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Eboli, Pedro
      – PersonEntity:
          Name:
            NameFull: Lebel, Luc
      – PersonEntity:
          Name:
            NameFull: Santa-Eulalia, Luis Antonio de
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 10
              Text: Oct2025
              Type: published
              Y: 2025
          Identifiers:
            – Type: issn-print
              Value: 00207543
          Numbering:
            – Type: volume
              Value: 63
            – Type: issue
              Value: 19
          Titles:
            – TitleFull: International Journal of Production Research
              Type: main
ResultId 1