Implementing Digital Visual Management: Case Studies on Barriers and Enablers.

Saved in:
Bibliographic Details
Title: Implementing Digital Visual Management: Case Studies on Barriers and Enablers.
Authors: Reinbold, Ana1 ana.reinbold@aalto.fi, Lappalainen, Eelon2 eelon.lappalainen@aalto.fi, Uusitalo, Petri2 petri.uusitalo@aalto.fi, Seppänen, Olli3 olli.seppanen@aalto.fi, Peltokorpi, Antti3 antti.peltokorpi@aalto.fi
Source: Lean Construction Journal. 2025, p45-71. 27p.
Subjects: Situational awareness, Project management, Continuous improvement process, Architectural engineering, Adoption of ideas, Theory of constraints, Facilitators (Persons), Data visualization
Abstract: Question: The architecture, engineering and construction industry (AEC) has an increasing interest in achieving better situational awareness (SA) in complex projects. The implementation of digital visual management (DVM) tools as a means of communication to increase SA in AEC projects has the potential to simplify information dissemination. What are the barriers faced during the implementation of DVM? Is it possible to identify factors that can facilitate implementation? Purpose: The purpose of this paper is to identify the barriers encountered during the implementation of DVM and to identify possible countermeasures to overcome such barriers. Research Method: 21 interviews were conducted with project management professionals who implemented DVM in four projects in Finland. Findings: Barriers include technological limitations on data collection and sharing of information, cultural mistrust among project participants, and increased work for data collection. On the other hand, the findings show that lean principles, such as the openness of the environment to share information, the standardization of work, and continuous improvement, have the potential to facilitate DVM implementation. Limitations: Interviews as a research method are limited due to their subjective nature. In addition, the interviews were limited to Finnish projects and complex infrastructure project management professionals. Thus, the results and explanations do not necessarily generalize to other construction industries or project types. Implications: Project teams that desire to implement DVM or that are implementing DVM can now identify expected barriers and plan possible ways of overcoming them during implementation in advance. The identified enablers contribute to knowledge about DVM and can offer practical guidance during the implementation of these strategies. Value for authors: This paper identifies barriers and enablers to the adoption and implementation of DVM. [ABSTRACT FROM AUTHOR]
Copyright of Lean Construction Journal is the property of Lean Construction Institute and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
FullText Links:
  – Type: pdflink
Text:
  Availability: 0
Header DbId: egs
DbLabel: Engineering Source
An: 190604152
AccessLevel: 6
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Implementing Digital Visual Management: Case Studies on Barriers and Enablers.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Reinbold%2C+Ana%22">Reinbold, Ana</searchLink><relatesTo>1</relatesTo><i> ana.reinbold@aalto.fi</i><br /><searchLink fieldCode="AR" term="%22Lappalainen%2C+Eelon%22">Lappalainen, Eelon</searchLink><relatesTo>2</relatesTo><i> eelon.lappalainen@aalto.fi</i><br /><searchLink fieldCode="AR" term="%22Uusitalo%2C+Petri%22">Uusitalo, Petri</searchLink><relatesTo>2</relatesTo><i> petri.uusitalo@aalto.fi</i><br /><searchLink fieldCode="AR" term="%22Seppänen%2C+Olli%22">Seppänen, Olli</searchLink><relatesTo>3</relatesTo><i> olli.seppanen@aalto.fi</i><br /><searchLink fieldCode="AR" term="%22Peltokorpi%2C+Antti%22">Peltokorpi, Antti</searchLink><relatesTo>3</relatesTo><i> antti.peltokorpi@aalto.fi</i>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22Lean+Construction+Journal%22">Lean Construction Journal</searchLink>. 2025, p45-71. 27p.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Situational+awareness%22">Situational awareness</searchLink><br /><searchLink fieldCode="DE" term="%22Project+management%22">Project management</searchLink><br /><searchLink fieldCode="DE" term="%22Continuous+improvement+process%22">Continuous improvement process</searchLink><br /><searchLink fieldCode="DE" term="%22Architectural+engineering%22">Architectural engineering</searchLink><br /><searchLink fieldCode="DE" term="%22Adoption+of+ideas%22">Adoption of ideas</searchLink><br /><searchLink fieldCode="DE" term="%22Theory+of+constraints%22">Theory of constraints</searchLink><br /><searchLink fieldCode="DE" term="%22Facilitators+%28Persons%29%22">Facilitators (Persons)</searchLink><br /><searchLink fieldCode="DE" term="%22Data+visualization%22">Data visualization</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: Question: The architecture, engineering and construction industry (AEC) has an increasing interest in achieving better situational awareness (SA) in complex projects. The implementation of digital visual management (DVM) tools as a means of communication to increase SA in AEC projects has the potential to simplify information dissemination. What are the barriers faced during the implementation of DVM? Is it possible to identify factors that can facilitate implementation? Purpose: The purpose of this paper is to identify the barriers encountered during the implementation of DVM and to identify possible countermeasures to overcome such barriers. Research Method: 21 interviews were conducted with project management professionals who implemented DVM in four projects in Finland. Findings: Barriers include technological limitations on data collection and sharing of information, cultural mistrust among project participants, and increased work for data collection. On the other hand, the findings show that lean principles, such as the openness of the environment to share information, the standardization of work, and continuous improvement, have the potential to facilitate DVM implementation. Limitations: Interviews as a research method are limited due to their subjective nature. In addition, the interviews were limited to Finnish projects and complex infrastructure project management professionals. Thus, the results and explanations do not necessarily generalize to other construction industries or project types. Implications: Project teams that desire to implement DVM or that are implementing DVM can now identify expected barriers and plan possible ways of overcoming them during implementation in advance. The identified enablers contribute to knowledge about DVM and can offer practical guidance during the implementation of these strategies. Value for authors: This paper identifies barriers and enablers to the adoption and implementation of DVM. [ABSTRACT FROM AUTHOR]
– Name: AbstractSuppliedCopyright
  Label:
  Group: Ab
  Data: <i>Copyright of Lean Construction Journal is the property of Lean Construction Institute and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=190604152
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.60164/3ebgqeshn
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 27
        StartPage: 45
    Subjects:
      – SubjectFull: Situational awareness
        Type: general
      – SubjectFull: Project management
        Type: general
      – SubjectFull: Continuous improvement process
        Type: general
      – SubjectFull: Architectural engineering
        Type: general
      – SubjectFull: Adoption of ideas
        Type: general
      – SubjectFull: Theory of constraints
        Type: general
      – SubjectFull: Facilitators (Persons)
        Type: general
      – SubjectFull: Data visualization
        Type: general
    Titles:
      – TitleFull: Implementing Digital Visual Management: Case Studies on Barriers and Enablers.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Reinbold, Ana
      – PersonEntity:
          Name:
            NameFull: Lappalainen, Eelon
      – PersonEntity:
          Name:
            NameFull: Uusitalo, Petri
      – PersonEntity:
          Name:
            NameFull: Seppänen, Olli
      – PersonEntity:
          Name:
            NameFull: Peltokorpi, Antti
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 01
              Text: 2025
              Type: published
              Y: 2025
          Identifiers:
            – Type: issn-print
              Value: 15551369
          Titles:
            – TitleFull: Lean Construction Journal
              Type: main
ResultId 1