Implementing Digital Visual Management: Case Studies on Barriers and Enablers.
Saved in:
| Title: | Implementing Digital Visual Management: Case Studies on Barriers and Enablers. |
|---|---|
| Authors: | Reinbold, Ana1 ana.reinbold@aalto.fi, Lappalainen, Eelon2 eelon.lappalainen@aalto.fi, Uusitalo, Petri2 petri.uusitalo@aalto.fi, Seppänen, Olli3 olli.seppanen@aalto.fi, Peltokorpi, Antti3 antti.peltokorpi@aalto.fi |
| Source: | Lean Construction Journal. 2025, p45-71. 27p. |
| Subjects: | Situational awareness, Project management, Continuous improvement process, Architectural engineering, Adoption of ideas, Theory of constraints, Facilitators (Persons), Data visualization |
| Abstract: | Question: The architecture, engineering and construction industry (AEC) has an increasing interest in achieving better situational awareness (SA) in complex projects. The implementation of digital visual management (DVM) tools as a means of communication to increase SA in AEC projects has the potential to simplify information dissemination. What are the barriers faced during the implementation of DVM? Is it possible to identify factors that can facilitate implementation? Purpose: The purpose of this paper is to identify the barriers encountered during the implementation of DVM and to identify possible countermeasures to overcome such barriers. Research Method: 21 interviews were conducted with project management professionals who implemented DVM in four projects in Finland. Findings: Barriers include technological limitations on data collection and sharing of information, cultural mistrust among project participants, and increased work for data collection. On the other hand, the findings show that lean principles, such as the openness of the environment to share information, the standardization of work, and continuous improvement, have the potential to facilitate DVM implementation. Limitations: Interviews as a research method are limited due to their subjective nature. In addition, the interviews were limited to Finnish projects and complex infrastructure project management professionals. Thus, the results and explanations do not necessarily generalize to other construction industries or project types. Implications: Project teams that desire to implement DVM or that are implementing DVM can now identify expected barriers and plan possible ways of overcoming them during implementation in advance. The identified enablers contribute to knowledge about DVM and can offer practical guidance during the implementation of these strategies. Value for authors: This paper identifies barriers and enablers to the adoption and implementation of DVM. [ABSTRACT FROM AUTHOR] |
| Copyright of Lean Construction Journal is the property of Lean Construction Institute and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Engineering Source |
| FullText | Links: – Type: pdflink Text: Availability: 0 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 190604152 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Implementing Digital Visual Management: Case Studies on Barriers and Enablers. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Reinbold%2C+Ana%22">Reinbold, Ana</searchLink><relatesTo>1</relatesTo><i> ana.reinbold@aalto.fi</i><br /><searchLink fieldCode="AR" term="%22Lappalainen%2C+Eelon%22">Lappalainen, Eelon</searchLink><relatesTo>2</relatesTo><i> eelon.lappalainen@aalto.fi</i><br /><searchLink fieldCode="AR" term="%22Uusitalo%2C+Petri%22">Uusitalo, Petri</searchLink><relatesTo>2</relatesTo><i> petri.uusitalo@aalto.fi</i><br /><searchLink fieldCode="AR" term="%22Seppänen%2C+Olli%22">Seppänen, Olli</searchLink><relatesTo>3</relatesTo><i> olli.seppanen@aalto.fi</i><br /><searchLink fieldCode="AR" term="%22Peltokorpi%2C+Antti%22">Peltokorpi, Antti</searchLink><relatesTo>3</relatesTo><i> antti.peltokorpi@aalto.fi</i> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Lean+Construction+Journal%22">Lean Construction Journal</searchLink>. 2025, p45-71. 27p. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22Situational+awareness%22">Situational awareness</searchLink><br /><searchLink fieldCode="DE" term="%22Project+management%22">Project management</searchLink><br /><searchLink fieldCode="DE" term="%22Continuous+improvement+process%22">Continuous improvement process</searchLink><br /><searchLink fieldCode="DE" term="%22Architectural+engineering%22">Architectural engineering</searchLink><br /><searchLink fieldCode="DE" term="%22Adoption+of+ideas%22">Adoption of ideas</searchLink><br /><searchLink fieldCode="DE" term="%22Theory+of+constraints%22">Theory of constraints</searchLink><br /><searchLink fieldCode="DE" term="%22Facilitators+%28Persons%29%22">Facilitators (Persons)</searchLink><br /><searchLink fieldCode="DE" term="%22Data+visualization%22">Data visualization</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: Question: The architecture, engineering and construction industry (AEC) has an increasing interest in achieving better situational awareness (SA) in complex projects. The implementation of digital visual management (DVM) tools as a means of communication to increase SA in AEC projects has the potential to simplify information dissemination. What are the barriers faced during the implementation of DVM? Is it possible to identify factors that can facilitate implementation? Purpose: The purpose of this paper is to identify the barriers encountered during the implementation of DVM and to identify possible countermeasures to overcome such barriers. Research Method: 21 interviews were conducted with project management professionals who implemented DVM in four projects in Finland. Findings: Barriers include technological limitations on data collection and sharing of information, cultural mistrust among project participants, and increased work for data collection. On the other hand, the findings show that lean principles, such as the openness of the environment to share information, the standardization of work, and continuous improvement, have the potential to facilitate DVM implementation. Limitations: Interviews as a research method are limited due to their subjective nature. In addition, the interviews were limited to Finnish projects and complex infrastructure project management professionals. Thus, the results and explanations do not necessarily generalize to other construction industries or project types. Implications: Project teams that desire to implement DVM or that are implementing DVM can now identify expected barriers and plan possible ways of overcoming them during implementation in advance. The identified enablers contribute to knowledge about DVM and can offer practical guidance during the implementation of these strategies. Value for authors: This paper identifies barriers and enablers to the adoption and implementation of DVM. [ABSTRACT FROM AUTHOR] – Name: AbstractSuppliedCopyright Label: Group: Ab Data: <i>Copyright of Lean Construction Journal is the property of Lean Construction Institute and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=190604152 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.60164/3ebgqeshn Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 27 StartPage: 45 Subjects: – SubjectFull: Situational awareness Type: general – SubjectFull: Project management Type: general – SubjectFull: Continuous improvement process Type: general – SubjectFull: Architectural engineering Type: general – SubjectFull: Adoption of ideas Type: general – SubjectFull: Theory of constraints Type: general – SubjectFull: Facilitators (Persons) Type: general – SubjectFull: Data visualization Type: general Titles: – TitleFull: Implementing Digital Visual Management: Case Studies on Barriers and Enablers. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Reinbold, Ana – PersonEntity: Name: NameFull: Lappalainen, Eelon – PersonEntity: Name: NameFull: Uusitalo, Petri – PersonEntity: Name: NameFull: Seppänen, Olli – PersonEntity: Name: NameFull: Peltokorpi, Antti IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 01 Text: 2025 Type: published Y: 2025 Identifiers: – Type: issn-print Value: 15551369 Titles: – TitleFull: Lean Construction Journal Type: main |
| ResultId | 1 |