Mota, A., Ávila, P., Afonso, L., Bastos, J., & Putnik, G. (2026). A COMPARATIVE STUDY OF METAHEURISTIC ALGORITHMS FOR SCHEDULING ON UNRELATED PARALLEL MACHINES: MINIMIZING WEIGHTED EARLINESS--TARDINESS WITH NON-ZERO RELEASE TIMES AND DISTINCT DUE DATES. International Journal of Industrial Engineering, 33(2), 218. https://doi.org/10.23055/ijietap.2026.33.2.11255
Chicago Style (17th ed.) CitationMota, Alzira, Paulo Ávila, Luís Afonso, João Bastos, and Goran Putnik. "A COMPARATIVE STUDY OF METAHEURISTIC ALGORITHMS FOR SCHEDULING ON UNRELATED PARALLEL MACHINES: MINIMIZING WEIGHTED EARLINESS--TARDINESS WITH NON-ZERO RELEASE TIMES AND DISTINCT DUE DATES." International Journal of Industrial Engineering 33, no. 2 (2026): 218. https://doi.org/10.23055/ijietap.2026.33.2.11255.
MLA (9th ed.) CitationMota, Alzira, et al. "A COMPARATIVE STUDY OF METAHEURISTIC ALGORITHMS FOR SCHEDULING ON UNRELATED PARALLEL MACHINES: MINIMIZING WEIGHTED EARLINESS--TARDINESS WITH NON-ZERO RELEASE TIMES AND DISTINCT DUE DATES." International Journal of Industrial Engineering, vol. 33, no. 2, 2026, p. 218, https://doi.org/10.23055/ijietap.2026.33.2.11255.