Numerical Simulation Study of Shield Tunnel Construction Under Canal in Water‐Rich Sand Layer.

Saved in:
Bibliographic Details
Title: Numerical Simulation Study of Shield Tunnel Construction Under Canal in Water‐Rich Sand Layer.
Authors: Liu, Jianhua1,2 (AUTHOR), Bai, Liliuyang1 (AUTHOR) nicholasvvhite@outlook.com, Chen, Xing3 (AUTHOR), Liu, Ke1 (AUTHOR), Zhou, Lejiang1 (AUTHOR), Ji, Jian (AUTHOR) jian.ji@hhu.edu.cn
Source: Advances in Civil Engineering. 6/30/2026, Vol. 2026, p1-23. 23p.
Subjects: Pore water pressure, Grouting, Computer simulation, Soil mechanics, Sandy soils, Tunnel design & construction, Construction management
Geographic Terms: China
Abstract: To address the amplified ground deformation, the difficulty of controlling shield construction parameters, and the pronounced seepage‐related risks associated with twin earth pressure balance (EPB) shield tunneling beneath a canal and a mid‐channel divider island in water‐rich sandy strata, this study is based on Phase I of Nantong Metro Line 1 in China. Physical and mechanical parameters of the water‐rich sandy strata are obtained through field sampling and laboratory testing. A three‐dimensional staged construction model is then established in FLAC3D to examine the effects of key construction variables on ground deformation, identify critical control targets, and analyze the response of the pore water pressure field to construction disturbance. The results show that ground settlement is governed by the superposition of plastic zones and the cumulative effect of volume loss induced by twin‐tunnel construction, and exhibits a segmented pattern consistent with the engineering boundary conditions. Settlement peaks tend to occur at the divider island, riverbanks, and transitional construction sections. The effect of excavation face support pressure on settlement is nonlinear, both underpressure and overpressure amplify settlement, but the adverse effect of overpressure is more pronounced. In canal sections, synchronous grouting pressure exhibits a compensation threshold, beyond which excessive uplift of the riverbed and a higher risk of differential deformation occur. While limiting uplift, a grouting pressure of 0.2 MPa provides relatively stable settlement control. Construction‐induced pore water pressure disturbance is concentrated mainly in the vicinity of the excavation face, and transitional sections are more prone to hydraulic gradient concentration. These findings clarify the mechanism of ground deformation during twin EPB shield tunneling beneath canals in water‐rich sandy strata and provide useful reference for shield parameter design, monitoring layout, and engineering risk assessment in similar projects. [ABSTRACT FROM AUTHOR]
Copyright of Advances in Civil Engineering is the property of Wiley-Blackwell and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
Full text is not displayed to guests.
FullText Links:
  – Type: pdflink
Text:
  Availability: 1
Header DbId: egs
DbLabel: Engineering Source
An: 194973627
AccessLevel: 6
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Numerical Simulation Study of Shield Tunnel Construction Under Canal in Water‐Rich Sand Layer.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Liu%2C+Jianhua%22">Liu, Jianhua</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Bai%2C+Liliuyang%22">Bai, Liliuyang</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> nicholasvvhite@outlook.com</i><br /><searchLink fieldCode="AR" term="%22Chen%2C+Xing%22">Chen, Xing</searchLink><relatesTo>3</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Liu%2C+Ke%22">Liu, Ke</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Zhou%2C+Lejiang%22">Zhou, Lejiang</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Ji%2C+Jian%22">Ji, Jian</searchLink> (AUTHOR)<i> jian.ji@hhu.edu.cn</i>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22Advances+in+Civil+Engineering%22">Advances in Civil Engineering</searchLink>. 6/30/2026, Vol. 2026, p1-23. 23p.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Pore+water+pressure%22">Pore water pressure</searchLink><br /><searchLink fieldCode="DE" term="%22Grouting%22">Grouting</searchLink><br /><searchLink fieldCode="DE" term="%22Computer+simulation%22">Computer simulation</searchLink><br /><searchLink fieldCode="DE" term="%22Soil+mechanics%22">Soil mechanics</searchLink><br /><searchLink fieldCode="DE" term="%22Sandy+soils%22">Sandy soils</searchLink><br /><searchLink fieldCode="DE" term="%22Tunnel+design+%26+construction%22">Tunnel design & construction</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+management%22">Construction management</searchLink>
– Name: SubjectGeographic
  Label: Geographic Terms
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22China%22">China</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: To address the amplified ground deformation, the difficulty of controlling shield construction parameters, and the pronounced seepage‐related risks associated with twin earth pressure balance (EPB) shield tunneling beneath a canal and a mid‐channel divider island in water‐rich sandy strata, this study is based on Phase I of Nantong Metro Line 1 in China. Physical and mechanical parameters of the water‐rich sandy strata are obtained through field sampling and laboratory testing. A three‐dimensional staged construction model is then established in FLAC3D to examine the effects of key construction variables on ground deformation, identify critical control targets, and analyze the response of the pore water pressure field to construction disturbance. The results show that ground settlement is governed by the superposition of plastic zones and the cumulative effect of volume loss induced by twin‐tunnel construction, and exhibits a segmented pattern consistent with the engineering boundary conditions. Settlement peaks tend to occur at the divider island, riverbanks, and transitional construction sections. The effect of excavation face support pressure on settlement is nonlinear, both underpressure and overpressure amplify settlement, but the adverse effect of overpressure is more pronounced. In canal sections, synchronous grouting pressure exhibits a compensation threshold, beyond which excessive uplift of the riverbed and a higher risk of differential deformation occur. While limiting uplift, a grouting pressure of 0.2 MPa provides relatively stable settlement control. Construction‐induced pore water pressure disturbance is concentrated mainly in the vicinity of the excavation face, and transitional sections are more prone to hydraulic gradient concentration. These findings clarify the mechanism of ground deformation during twin EPB shield tunneling beneath canals in water‐rich sandy strata and provide useful reference for shield parameter design, monitoring layout, and engineering risk assessment in similar projects. [ABSTRACT FROM AUTHOR]
– Name: AbstractSuppliedCopyright
  Label:
  Group: Ab
  Data: <i>Copyright of Advances in Civil Engineering is the property of Wiley-Blackwell and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=194973627
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.1155/adce/4412394
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 23
        StartPage: 1
    Subjects:
      – SubjectFull: Pore water pressure
        Type: general
      – SubjectFull: Grouting
        Type: general
      – SubjectFull: Computer simulation
        Type: general
      – SubjectFull: Soil mechanics
        Type: general
      – SubjectFull: Sandy soils
        Type: general
      – SubjectFull: Tunnel design & construction
        Type: general
      – SubjectFull: Construction management
        Type: general
      – SubjectFull: China
        Type: general
    Titles:
      – TitleFull: Numerical Simulation Study of Shield Tunnel Construction Under Canal in Water‐Rich Sand Layer.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Liu, Jianhua
      – PersonEntity:
          Name:
            NameFull: Bai, Liliuyang
      – PersonEntity:
          Name:
            NameFull: Chen, Xing
      – PersonEntity:
          Name:
            NameFull: Liu, Ke
      – PersonEntity:
          Name:
            NameFull: Zhou, Lejiang
      – PersonEntity:
          Name:
            NameFull: Ji, Jian
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 30
              M: 06
              Text: 6/30/2026
              Type: published
              Y: 2026
          Identifiers:
            – Type: issn-print
              Value: 16878086
          Numbering:
            – Type: volume
              Value: 2026
          Titles:
            – TitleFull: Advances in Civil Engineering
              Type: main
ResultId 1