Makeswaran, J., & Mahendran, M. (2026). Predicting the pull-through capacity of crest-fixed trapezoidal cladding with closely spaced ribs subject to localised dimpling and splitting failures. Advances in Structural Engineering, 29(11), 2288. https://doi.org/10.1177/13694332251407271
Chicago Style (17th ed.) CitationMakeswaran, Jenothan, and Mahen Mahendran. "Predicting the Pull-through Capacity of Crest-fixed Trapezoidal Cladding with Closely Spaced Ribs Subject to Localised Dimpling and Splitting Failures." Advances in Structural Engineering 29, no. 11 (2026): 2288. https://doi.org/10.1177/13694332251407271.
MLA (9th ed.) CitationMakeswaran, Jenothan, and Mahen Mahendran. "Predicting the Pull-through Capacity of Crest-fixed Trapezoidal Cladding with Closely Spaced Ribs Subject to Localised Dimpling and Splitting Failures." Advances in Structural Engineering, vol. 29, no. 11, 2026, p. 2288, https://doi.org/10.1177/13694332251407271.