Construction Delays in Hong Kong Civil Engineering Projects.

Saved in:
Bibliographic Details
Title: Construction Delays in Hong Kong Civil Engineering Projects.
Authors: Lo, Tommy Y.1 bctommyl@cityu.edu.hk, Fung, Ivan W. H.2 bcivan@cityu.edu.hk, Tung, Karen C. F.3 96476360@student.cityu.edu.hk
Source: Journal of Construction Engineering & Management. Jun2006, Vol. 132 Issue 6, p636-649. 14p. 15 Charts.
Subjects: Construction contracts, Civil engineering contracts, Project management, Construction industry
Geographic Terms: Hong Kong (China), China
Abstract: Construction delays are common in civil engineering projects in Hong Kong, inevitably resulting in contractual claims and increased project cost. This study was aimed, first, at gathering the perceptions of civil construction practitioners on how significant are the causes of delay; and, second, investigating whether the suggestions as stated in the report of the Construction Industry Review Committee (the Committee comprises members with good standing and knowledge in the construction and related fields as well as those from other professions who are responsible for examining the current state of the construction industry in terms of its output quantity, the quality of work, its environmental friendliness, site safety, its workforce and the system of supervision) are applicable to and effective at mitigating the corresponding delays with reference to a ranking order established using the mean score method. The extent of the differences in perception among the different respondent groups on these two issues was also examined using the rank agreement factor (RAF), percentage agreement (PA), and percentage disagreement (PD). The differences in the perceptions of the respondents on the significance of delays and the actual causes of delays for the six projects studied were also examined. The results of the study showed that the respondents tended to admit their own faults as shown in the top ten significant causes of delay. A strong consensus was found between the client and consultant groups on the significance of the various causes of delay (PA=74%) and the effectiveness of mitigation measures (PA=67%) compared with the other pairs of groups. The consultant and contractor groups held extremely different perceptions regarding the significance of various delay causes (RAF=4.9 and PD=32%) and the effectiveness of corresponding mitigation measures (RAF=6.2 and PD=47%). It is believed that the findings can provide much more insight for the construction practitioners as well as the researchers and thus help to improve the productivity and overall performance of civil construction projects in Hong Kong. [ABSTRACT FROM AUTHOR]
Copyright of Journal of Construction Engineering & Management is the property of American Society of Civil Engineers and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
FullText Links:
  – Type: pdflink
Text:
  Availability: 0
Header DbId: egs
DbLabel: Engineering Source
An: 20854678
AccessLevel: 6
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Construction Delays in Hong Kong Civil Engineering Projects.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Lo%2C+Tommy+Y%2E%22">Lo, Tommy Y.</searchLink><relatesTo>1</relatesTo><i> bctommyl@cityu.edu.hk</i><br /><searchLink fieldCode="AR" term="%22Fung%2C+Ivan+W%2E+H%2E%22">Fung, Ivan W. H.</searchLink><relatesTo>2</relatesTo><i> bcivan@cityu.edu.hk</i><br /><searchLink fieldCode="AR" term="%22Tung%2C+Karen+C%2E+F%2E%22">Tung, Karen C. F.</searchLink><relatesTo>3</relatesTo><i> 96476360@student.cityu.edu.hk</i>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22Journal+of+Construction+Engineering+%26+Management%22">Journal of Construction Engineering & Management</searchLink>. Jun2006, Vol. 132 Issue 6, p636-649. 14p. 15 Charts.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Construction+contracts%22">Construction contracts</searchLink><br /><searchLink fieldCode="DE" term="%22Civil+engineering+contracts%22">Civil engineering contracts</searchLink><br /><searchLink fieldCode="DE" term="%22Project+management%22">Project management</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+industry%22">Construction industry</searchLink>
– Name: SubjectGeographic
  Label: Geographic Terms
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Hong+Kong+%28China%29%22">Hong Kong (China)</searchLink><br /><searchLink fieldCode="DE" term="%22China%22">China</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: Construction delays are common in civil engineering projects in Hong Kong, inevitably resulting in contractual claims and increased project cost. This study was aimed, first, at gathering the perceptions of civil construction practitioners on how significant are the causes of delay; and, second, investigating whether the suggestions as stated in the report of the Construction Industry Review Committee (the Committee comprises members with good standing and knowledge in the construction and related fields as well as those from other professions who are responsible for examining the current state of the construction industry in terms of its output quantity, the quality of work, its environmental friendliness, site safety, its workforce and the system of supervision) are applicable to and effective at mitigating the corresponding delays with reference to a ranking order established using the mean score method. The extent of the differences in perception among the different respondent groups on these two issues was also examined using the rank agreement factor (RAF), percentage agreement (PA), and percentage disagreement (PD). The differences in the perceptions of the respondents on the significance of delays and the actual causes of delays for the six projects studied were also examined. The results of the study showed that the respondents tended to admit their own faults as shown in the top ten significant causes of delay. A strong consensus was found between the client and consultant groups on the significance of the various causes of delay (PA=74%) and the effectiveness of mitigation measures (PA=67%) compared with the other pairs of groups. The consultant and contractor groups held extremely different perceptions regarding the significance of various delay causes (RAF=4.9 and PD=32%) and the effectiveness of corresponding mitigation measures (RAF=6.2 and PD=47%). It is believed that the findings can provide much more insight for the construction practitioners as well as the researchers and thus help to improve the productivity and overall performance of civil construction projects in Hong Kong. [ABSTRACT FROM AUTHOR]
– Name: AbstractSuppliedCopyright
  Label:
  Group: Ab
  Data: <i>Copyright of Journal of Construction Engineering & Management is the property of American Society of Civil Engineers and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=20854678
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.1061/(ASCE)0733-9364(2006)132:6(636)
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 14
        StartPage: 636
    Subjects:
      – SubjectFull: Construction contracts
        Type: general
      – SubjectFull: Civil engineering contracts
        Type: general
      – SubjectFull: Project management
        Type: general
      – SubjectFull: Construction industry
        Type: general
      – SubjectFull: Hong Kong (China)
        Type: general
      – SubjectFull: China
        Type: general
    Titles:
      – TitleFull: Construction Delays in Hong Kong Civil Engineering Projects.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Lo, Tommy Y.
      – PersonEntity:
          Name:
            NameFull: Fung, Ivan W. H.
      – PersonEntity:
          Name:
            NameFull: Tung, Karen C. F.
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 06
              Text: Jun2006
              Type: published
              Y: 2006
          Identifiers:
            – Type: issn-print
              Value: 07339364
          Numbering:
            – Type: volume
              Value: 132
            – Type: issue
              Value: 6
          Titles:
            – TitleFull: Journal of Construction Engineering & Management
              Type: main
ResultId 1