Reducing planned outages for book hardware maintenance with concurrent book replacement.
Saved in:
| Title: | Reducing planned outages for book hardware maintenance with concurrent book replacement. |
|---|---|
| Authors: | Conklin, C. R.1 smokey@us.ibm.com, Hollenback, C. J.2 chollenb@us.ibm.com, Mayer, C.3 carl@de.ibm.com, Winter, A.3 wintera@de.ibm.com |
| Source: | IBM Journal of Research & Development. Jan/Mar2007, Vol. 51 Issue 1/2, p157-171. 15p. |
| Subjects: | IBM computer peripherals, International Business Machines Corp., System failures, Client/server computing, Software maintenance |
| Abstract: | The IBM System z9™ introduces the enhanced book availability (EBA) feature to reduce the number of planned system outages. Included as part of the EBA feature is the concurrent book replacement (CBR) function, which allows a single book in a multi-book server to be concurrently removed from the system in order for service personnel to perform a repair or to physically upgrade the hardware on the book. This repaired or upgraded book is then concurrently replaced and reintegrated into the server configuration. In this paper, we describe the benefits that the concurrent book replacement function offers a customer during a planned repair or upgrade of the System z9. We also describe a tool, developed to analyze the server in order to determine whether the server is "prepared" for the concurrent book replacement operation, and we provide an overview of the actions performed by this tool. The paper also contains a description of the concurrent book replacement operation, with an emphasis on the unique functions developed as part of this design. [ABSTRACT FROM AUTHOR] |
| Copyright of IBM Journal of Research & Development is the property of IBM Corporation/IBM Journals and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Engineering Source |
| FullText | Text: Availability: 0 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 24672742 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Reducing planned outages for book hardware maintenance with concurrent book replacement. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Conklin%2C+C%2E+R%2E%22">Conklin, C. R.</searchLink><relatesTo>1</relatesTo><i> smokey@us.ibm.com</i><br /><searchLink fieldCode="AR" term="%22Hollenback%2C+C%2E+J%2E%22">Hollenback, C. J.</searchLink><relatesTo>2</relatesTo><i> chollenb@us.ibm.com</i><br /><searchLink fieldCode="AR" term="%22Mayer%2C+C%2E%22">Mayer, C.</searchLink><relatesTo>3</relatesTo><i> carl@de.ibm.com</i><br /><searchLink fieldCode="AR" term="%22Winter%2C+A%2E%22">Winter, A.</searchLink><relatesTo>3</relatesTo><i> wintera@de.ibm.com</i> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22IBM+Journal+of+Research+%26+Development%22">IBM Journal of Research & Development</searchLink>. Jan/Mar2007, Vol. 51 Issue 1/2, p157-171. 15p. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22IBM+computer+peripherals%22">IBM computer peripherals</searchLink><br /><searchLink fieldCode="DE" term="%22International+Business+Machines+Corp%2E%22">International Business Machines Corp.</searchLink><br /><searchLink fieldCode="DE" term="%22System+failures%22">System failures</searchLink><br /><searchLink fieldCode="DE" term="%22Client%2Fserver+computing%22">Client/server computing</searchLink><br /><searchLink fieldCode="DE" term="%22Software+maintenance%22">Software maintenance</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: The IBM System z9™ introduces the enhanced book availability (EBA) feature to reduce the number of planned system outages. Included as part of the EBA feature is the concurrent book replacement (CBR) function, which allows a single book in a multi-book server to be concurrently removed from the system in order for service personnel to perform a repair or to physically upgrade the hardware on the book. This repaired or upgraded book is then concurrently replaced and reintegrated into the server configuration. In this paper, we describe the benefits that the concurrent book replacement function offers a customer during a planned repair or upgrade of the System z9. We also describe a tool, developed to analyze the server in order to determine whether the server is "prepared" for the concurrent book replacement operation, and we provide an overview of the actions performed by this tool. The paper also contains a description of the concurrent book replacement operation, with an emphasis on the unique functions developed as part of this design. [ABSTRACT FROM AUTHOR] – Name: AbstractSuppliedCopyright Label: Group: Ab Data: <i>Copyright of IBM Journal of Research & Development is the property of IBM Corporation/IBM Journals and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=24672742 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.1147/rd.511.0157 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 15 StartPage: 157 Subjects: – SubjectFull: IBM computer peripherals Type: general – SubjectFull: International Business Machines Corp. Type: general – SubjectFull: System failures Type: general – SubjectFull: Client/server computing Type: general – SubjectFull: Software maintenance Type: general Titles: – TitleFull: Reducing planned outages for book hardware maintenance with concurrent book replacement. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Conklin, C. R. – PersonEntity: Name: NameFull: Hollenback, C. J. – PersonEntity: Name: NameFull: Mayer, C. – PersonEntity: Name: NameFull: Winter, A. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 01 Text: Jan/Mar2007 Type: published Y: 2007 Identifiers: – Type: issn-print Value: 00188646 Numbering: – Type: volume Value: 51 – Type: issue Value: 1/2 Titles: – TitleFull: IBM Journal of Research & Development Type: main |
| ResultId | 1 |