Reducing planned outages for book hardware maintenance with concurrent book replacement.

Saved in:
Bibliographic Details
Title: Reducing planned outages for book hardware maintenance with concurrent book replacement.
Authors: Conklin, C. R.1 smokey@us.ibm.com, Hollenback, C. J.2 chollenb@us.ibm.com, Mayer, C.3 carl@de.ibm.com, Winter, A.3 wintera@de.ibm.com
Source: IBM Journal of Research & Development. Jan/Mar2007, Vol. 51 Issue 1/2, p157-171. 15p.
Subjects: IBM computer peripherals, International Business Machines Corp., System failures, Client/server computing, Software maintenance
Abstract: The IBM System z9™ introduces the enhanced book availability (EBA) feature to reduce the number of planned system outages. Included as part of the EBA feature is the concurrent book replacement (CBR) function, which allows a single book in a multi-book server to be concurrently removed from the system in order for service personnel to perform a repair or to physically upgrade the hardware on the book. This repaired or upgraded book is then concurrently replaced and reintegrated into the server configuration. In this paper, we describe the benefits that the concurrent book replacement function offers a customer during a planned repair or upgrade of the System z9. We also describe a tool, developed to analyze the server in order to determine whether the server is "prepared" for the concurrent book replacement operation, and we provide an overview of the actions performed by this tool. The paper also contains a description of the concurrent book replacement operation, with an emphasis on the unique functions developed as part of this design. [ABSTRACT FROM AUTHOR]
Copyright of IBM Journal of Research & Development is the property of IBM Corporation/IBM Journals and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
FullText Text:
  Availability: 0
Header DbId: egs
DbLabel: Engineering Source
An: 24672742
AccessLevel: 6
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Reducing planned outages for book hardware maintenance with concurrent book replacement.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Conklin%2C+C%2E+R%2E%22">Conklin, C. R.</searchLink><relatesTo>1</relatesTo><i> smokey@us.ibm.com</i><br /><searchLink fieldCode="AR" term="%22Hollenback%2C+C%2E+J%2E%22">Hollenback, C. J.</searchLink><relatesTo>2</relatesTo><i> chollenb@us.ibm.com</i><br /><searchLink fieldCode="AR" term="%22Mayer%2C+C%2E%22">Mayer, C.</searchLink><relatesTo>3</relatesTo><i> carl@de.ibm.com</i><br /><searchLink fieldCode="AR" term="%22Winter%2C+A%2E%22">Winter, A.</searchLink><relatesTo>3</relatesTo><i> wintera@de.ibm.com</i>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22IBM+Journal+of+Research+%26+Development%22">IBM Journal of Research & Development</searchLink>. Jan/Mar2007, Vol. 51 Issue 1/2, p157-171. 15p.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22IBM+computer+peripherals%22">IBM computer peripherals</searchLink><br /><searchLink fieldCode="DE" term="%22International+Business+Machines+Corp%2E%22">International Business Machines Corp.</searchLink><br /><searchLink fieldCode="DE" term="%22System+failures%22">System failures</searchLink><br /><searchLink fieldCode="DE" term="%22Client%2Fserver+computing%22">Client/server computing</searchLink><br /><searchLink fieldCode="DE" term="%22Software+maintenance%22">Software maintenance</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: The IBM System z9™ introduces the enhanced book availability (EBA) feature to reduce the number of planned system outages. Included as part of the EBA feature is the concurrent book replacement (CBR) function, which allows a single book in a multi-book server to be concurrently removed from the system in order for service personnel to perform a repair or to physically upgrade the hardware on the book. This repaired or upgraded book is then concurrently replaced and reintegrated into the server configuration. In this paper, we describe the benefits that the concurrent book replacement function offers a customer during a planned repair or upgrade of the System z9. We also describe a tool, developed to analyze the server in order to determine whether the server is "prepared" for the concurrent book replacement operation, and we provide an overview of the actions performed by this tool. The paper also contains a description of the concurrent book replacement operation, with an emphasis on the unique functions developed as part of this design. [ABSTRACT FROM AUTHOR]
– Name: AbstractSuppliedCopyright
  Label:
  Group: Ab
  Data: <i>Copyright of IBM Journal of Research & Development is the property of IBM Corporation/IBM Journals and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=24672742
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.1147/rd.511.0157
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 15
        StartPage: 157
    Subjects:
      – SubjectFull: IBM computer peripherals
        Type: general
      – SubjectFull: International Business Machines Corp.
        Type: general
      – SubjectFull: System failures
        Type: general
      – SubjectFull: Client/server computing
        Type: general
      – SubjectFull: Software maintenance
        Type: general
    Titles:
      – TitleFull: Reducing planned outages for book hardware maintenance with concurrent book replacement.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Conklin, C. R.
      – PersonEntity:
          Name:
            NameFull: Hollenback, C. J.
      – PersonEntity:
          Name:
            NameFull: Mayer, C.
      – PersonEntity:
          Name:
            NameFull: Winter, A.
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 01
              Text: Jan/Mar2007
              Type: published
              Y: 2007
          Identifiers:
            – Type: issn-print
              Value: 00188646
          Numbering:
            – Type: volume
              Value: 51
            – Type: issue
              Value: 1/2
          Titles:
            – TitleFull: IBM Journal of Research & Development
              Type: main
ResultId 1