Concurrent driver upgrade: Method to eliminate scheduled system outages for new function releases.

Saved in:
Bibliographic Details
Title: Concurrent driver upgrade: Method to eliminate scheduled system outages for new function releases.
Authors: Muehlbach, A.1 muhlbach@de.ibm.com, Valentine, B. D.2 bdvalent@us.ibm.com, Immel, D.1 immell@de.ibm.com, Bomar, M. S.2 bomarms@us.ibm.com, Bolan, T. V.2 bolant@us.ibm.com
Source: IBM Journal of Research & Development. Jan/Mar2007, Vol. 51 Issue 1/2, p185-193. 9p.
Subjects: Reliability in engineering, IBM computer peripherals, System downtime, Errors, Computer firmware
Abstract: The reliability, availability, and serviceability goal for an IBM zSeries® system is to provide 24-hour-per-day, 365-day-per-year service with reduced system downtime. The continuous reliable operation rate has been improved with every new zSeries release by using error prevention, error detection, error recovery, and other methods that contribute to avoiding unplanned interruptions. Until now, planned downtime--for example, the time needed to upgrade a zSeries to the next firmware driver--had not yet been addressed. We developed the concurrent driver upgrade (CDU) feature so that customers could acid new functions without downtime. It is now possible to upgrade the zSeries firmware engineering change (EC) driver to the next EC level without any performance impact during the upgrade. This paper describes the motivation and strategy of the CD U and describes its use. [ABSTRACT FROM AUTHOR]
Copyright of IBM Journal of Research & Development is the property of IBM Corporation/IBM Journals and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
Description
Abstract:The reliability, availability, and serviceability goal for an IBM zSeries® system is to provide 24-hour-per-day, 365-day-per-year service with reduced system downtime. The continuous reliable operation rate has been improved with every new zSeries release by using error prevention, error detection, error recovery, and other methods that contribute to avoiding unplanned interruptions. Until now, planned downtime--for example, the time needed to upgrade a zSeries to the next firmware driver--had not yet been addressed. We developed the concurrent driver upgrade (CDU) feature so that customers could acid new functions without downtime. It is now possible to upgrade the zSeries firmware engineering change (EC) driver to the next EC level without any performance impact during the upgrade. This paper describes the motivation and strategy of the CD U and describes its use. [ABSTRACT FROM AUTHOR]
ISSN:00188646
DOI:10.1147/rd.511.0185