Marco Polo Tension Leg Platform: Deepwater Completion Performance.

Saved in:
Bibliographic Details
Title: Marco Polo Tension Leg Platform: Deepwater Completion Performance.
Authors: Burman, Jack1, Renfro, Kevin2, Conrad, Mark2
Source: SPE Drilling & Completion. Sep2007, Vol. 22 Issue 3, p258-270. 13p. 1 Color Photograph, 1 Graph.
Subjects: Underwater drilling, Tension leg platforms, Offshore structures, Semi-submersible offshore structures, Hydraulic engineering, Drilling platforms, Drilling & boring, Prospecting
Geographic Terms: Gulf of Mexico
Abstract: The article focuses on how the implementation of the Marco Polo Deepwater Tension Leg Platform project in Green Canyon, Gulf of Mexico challenges of completing 17 zones in six deepwater dry-tree wells with a 1000-hp rig were met. It then highlights a number of concepts and "technical firsts" that can be applied to other deepwater-development projects. According to the authors, novel well completion techniques and exceptional field execution allowed the project to be accomplished significantly ahead of schedule. They notes that all six wells were placed on production in approximately 168 days.
Database: Engineering Source
FullText Text:
  Availability: 0
Header DbId: egs
DbLabel: Engineering Source
An: 27474310
AccessLevel: 6
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Marco Polo Tension Leg Platform: Deepwater Completion Performance.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Burman%2C+Jack%22">Burman, Jack</searchLink><relatesTo>1</relatesTo><br /><searchLink fieldCode="AR" term="%22Renfro%2C+Kevin%22">Renfro, Kevin</searchLink><relatesTo>2</relatesTo><br /><searchLink fieldCode="AR" term="%22Conrad%2C+Mark%22">Conrad, Mark</searchLink><relatesTo>2</relatesTo>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22SPE+Drilling+%26+Completion%22">SPE Drilling & Completion</searchLink>. Sep2007, Vol. 22 Issue 3, p258-270. 13p. 1 Color Photograph, 1 Graph.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Underwater+drilling%22">Underwater drilling</searchLink><br /><searchLink fieldCode="DE" term="%22Tension+leg+platforms%22">Tension leg platforms</searchLink><br /><searchLink fieldCode="DE" term="%22Offshore+structures%22">Offshore structures</searchLink><br /><searchLink fieldCode="DE" term="%22Semi-submersible+offshore+structures%22">Semi-submersible offshore structures</searchLink><br /><searchLink fieldCode="DE" term="%22Hydraulic+engineering%22">Hydraulic engineering</searchLink><br /><searchLink fieldCode="DE" term="%22Drilling+platforms%22">Drilling platforms</searchLink><br /><searchLink fieldCode="DE" term="%22Drilling+%26+boring%22">Drilling & boring</searchLink><br /><searchLink fieldCode="DE" term="%22Prospecting%22">Prospecting</searchLink>
– Name: SubjectGeographic
  Label: Geographic Terms
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Gulf+of+Mexico%22">Gulf of Mexico</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: The article focuses on how the implementation of the Marco Polo Deepwater Tension Leg Platform project in Green Canyon, Gulf of Mexico challenges of completing 17 zones in six deepwater dry-tree wells with a 1000-hp rig were met. It then highlights a number of concepts and "technical firsts" that can be applied to other deepwater-development projects. According to the authors, novel well completion techniques and exceptional field execution allowed the project to be accomplished significantly ahead of schedule. They notes that all six wells were placed on production in approximately 168 days.
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=27474310
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.2118/95331-PA
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 13
        StartPage: 258
    Subjects:
      – SubjectFull: Underwater drilling
        Type: general
      – SubjectFull: Tension leg platforms
        Type: general
      – SubjectFull: Offshore structures
        Type: general
      – SubjectFull: Semi-submersible offshore structures
        Type: general
      – SubjectFull: Hydraulic engineering
        Type: general
      – SubjectFull: Drilling platforms
        Type: general
      – SubjectFull: Drilling & boring
        Type: general
      – SubjectFull: Prospecting
        Type: general
      – SubjectFull: Gulf of Mexico
        Type: general
    Titles:
      – TitleFull: Marco Polo Tension Leg Platform: Deepwater Completion Performance.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Burman, Jack
      – PersonEntity:
          Name:
            NameFull: Renfro, Kevin
      – PersonEntity:
          Name:
            NameFull: Conrad, Mark
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 09
              Text: Sep2007
              Type: published
              Y: 2007
          Identifiers:
            – Type: issn-print
              Value: 10646671
          Numbering:
            – Type: volume
              Value: 22
            – Type: issue
              Value: 3
          Titles:
            – TitleFull: SPE Drilling & Completion
              Type: main
ResultId 1