Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types.
Saved in:
| Title: | Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types. |
|---|---|
| Authors: | Rshini, B. Sharadapriyada, Ran, C. Rajend |
| Source: | International Journal of Production Research. Nov97, Vol. 35 Issue 11, p3133-3156. 24p. |
| Subjects: | Production scheduling, Heuristic, Manufacturing processes, Operations research, Containers, Production control, Process control systems |
| Abstract: | We address the problem of scheduling in a Kanban-controlled flowshop with dual blocking mechanisms. The flowshop is also characterized by missing operations for part-types. We first present recursive equations for time-tabling of containers in a given sequence. We then present two heuristics for scheduling with the objectives of minimizing the sum of weighted waiting-time of containers and weighted flowtime of part-types. An extensive computational evaluation of the proposed heuristics is also presented. [ABSTRACT FROM AUTHOR] |
| Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Engineering Source |
| FullText | Links: – Type: pdflink Text: Availability: 0 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 6484172 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Rshini%2C+B%2E+Sharadapriyada%22">Rshini, B. Sharadapriyada</searchLink><br /><searchLink fieldCode="AR" term="%22Ran%2C+C%2E+Rajend%22">Ran, C. Rajend</searchLink> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22International+Journal+of+Production+Research%22">International Journal of Production Research</searchLink>. Nov97, Vol. 35 Issue 11, p3133-3156. 24p. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22Production+scheduling%22">Production scheduling</searchLink><br /><searchLink fieldCode="DE" term="%22Heuristic%22">Heuristic</searchLink><br /><searchLink fieldCode="DE" term="%22Manufacturing+processes%22">Manufacturing processes</searchLink><br /><searchLink fieldCode="DE" term="%22Operations+research%22">Operations research</searchLink><br /><searchLink fieldCode="DE" term="%22Containers%22">Containers</searchLink><br /><searchLink fieldCode="DE" term="%22Production+control%22">Production control</searchLink><br /><searchLink fieldCode="DE" term="%22Process+control+systems%22">Process control systems</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: We address the problem of scheduling in a Kanban-controlled flowshop with dual blocking mechanisms. The flowshop is also characterized by missing operations for part-types. We first present recursive equations for time-tabling of containers in a given sequence. We then present two heuristics for scheduling with the objectives of minimizing the sum of weighted waiting-time of containers and weighted flowtime of part-types. An extensive computational evaluation of the proposed heuristics is also presented. [ABSTRACT FROM AUTHOR] – Name: AbstractSuppliedCopyright Label: Group: Ab Data: <i>Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=6484172 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.1080/002075497194327 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 24 StartPage: 3133 Subjects: – SubjectFull: Production scheduling Type: general – SubjectFull: Heuristic Type: general – SubjectFull: Manufacturing processes Type: general – SubjectFull: Operations research Type: general – SubjectFull: Containers Type: general – SubjectFull: Production control Type: general – SubjectFull: Process control systems Type: general Titles: – TitleFull: Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Rshini, B. Sharadapriyada – PersonEntity: Name: NameFull: Ran, C. Rajend IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 11 Text: Nov97 Type: published Y: 1997 Identifiers: – Type: issn-print Value: 00207543 Numbering: – Type: volume Value: 35 – Type: issue Value: 11 Titles: – TitleFull: International Journal of Production Research Type: main |
| ResultId | 1 |