Lin, Y., Wu, D., Wang, X., Wang, X., & Gao, S. (2014). Lift path planning for a nonholonomic crawler crane. Automation in Construction, 44, 12. https://doi.org/10.1016/j.autcon.2014.03.007
Chicago Style (17th ed.) CitationLin, Yuanshan, Di Wu, Xin Wang, Xiukun Wang, and Shunde Gao. "Lift Path Planning for a Nonholonomic Crawler Crane." Automation in Construction 44 (2014): 12. https://doi.org/10.1016/j.autcon.2014.03.007.
MLA (9th ed.) CitationLin, Yuanshan, et al. "Lift Path Planning for a Nonholonomic Crawler Crane." Automation in Construction, vol. 44, 2014, p. 12, https://doi.org/10.1016/j.autcon.2014.03.007.
Warning: These citations may not always be 100% accurate.