Al-Gahtani, K. S., Al-Sulaihi, I. A., & Iqupal, A. (2016). Total float management: Computerized technique for construction delay analysis. Canadian Journal of Civil Engineering, 43(5), 391. https://doi.org/10.1139/cjce-2015-0434
Chicago Style (17th ed.) CitationAl-Gahtani, Khalid S., Ibrahim A. Al-Sulaihi, and Asif Iqupal. "Total Float Management: Computerized Technique for Construction Delay Analysis." Canadian Journal of Civil Engineering 43, no. 5 (2016): 391. https://doi.org/10.1139/cjce-2015-0434.
MLA (9th ed.) CitationAl-Gahtani, Khalid S., et al. "Total Float Management: Computerized Technique for Construction Delay Analysis." Canadian Journal of Civil Engineering, vol. 43, no. 5, 2016, p. 391, https://doi.org/10.1139/cjce-2015-0434.