Transition and optimization of the Henderson mine ventilation system.

Saved in:
Bibliographic Details
Title: Transition and optimization of the Henderson mine ventilation system.
Authors: Kolobe, K.1 kkolobe@fmi.com, Rutter, C.1, Shea, N.1
Source: Mining Engineering. Jul2022, Vol. 74 Issue 7, p91-92. 2p.
Subject Terms: *Mine ventilation
Abstract: Henderson Mine's primary production transitioned from the main portion of the 7700 level to the 7210 main panel in 2005. On the 7700 level, the southwest (SW) panel was brought into production in 2014 and produced through 2020. A-Panel was brought online in 2019 and took over primary production in 2020. The 7210 north panel is under development with production expected to commence in 2025. The 7700 northwest panel is expected to be the mine's last production panel. [ABSTRACT FROM AUTHOR]
Database: Energy & Power Source
FullText Links:
  – Type: pdflink
Text:
  Availability: 0
Header DbId: enr
DbLabel: Energy & Power Source
An: 158190187
AccessLevel: 6
PubType: Periodical
PubTypeId: serialPeriodical
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Transition and optimization of the Henderson mine ventilation system.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Kolobe%2C+K%2E%22">Kolobe, K.</searchLink><relatesTo>1</relatesTo><i> kkolobe@fmi.com</i><br /><searchLink fieldCode="AR" term="%22Rutter%2C+C%2E%22">Rutter, C.</searchLink><relatesTo>1</relatesTo><br /><searchLink fieldCode="AR" term="%22Shea%2C+N%2E%22">Shea, N.</searchLink><relatesTo>1</relatesTo>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22Mining+Engineering%22">Mining Engineering</searchLink>. Jul2022, Vol. 74 Issue 7, p91-92. 2p.
– Name: Subject
  Label: Subject Terms
  Group: Su
  Data: *<searchLink fieldCode="DE" term="%22Mine+ventilation%22">Mine ventilation</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: Henderson Mine's primary production transitioned from the main portion of the 7700 level to the 7210 main panel in 2005. On the 7700 level, the southwest (SW) panel was brought into production in 2014 and produced through 2020. A-Panel was brought online in 2019 and took over primary production in 2020. The 7210 north panel is under development with production expected to commence in 2025. The 7700 northwest panel is expected to be the mine's last production panel. [ABSTRACT FROM AUTHOR]
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=enr&AN=158190187
RecordInfo BibRecord:
  BibEntity:
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 2
        StartPage: 91
    Subjects:
      – SubjectFull: Mine ventilation
        Type: general
    Titles:
      – TitleFull: Transition and optimization of the Henderson mine ventilation system.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Kolobe, K.
      – PersonEntity:
          Name:
            NameFull: Rutter, C.
      – PersonEntity:
          Name:
            NameFull: Shea, N.
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 07
              Text: Jul2022
              Type: published
              Y: 2022
          Identifiers:
            – Type: issn-print
              Value: 00265187
          Numbering:
            – Type: volume
              Value: 74
            – Type: issue
              Value: 7
          Titles:
            – TitleFull: Mining Engineering
              Type: main
ResultId 1