Transition and optimization of the Henderson mine ventilation system.
Saved in:
| Title: | Transition and optimization of the Henderson mine ventilation system. |
|---|---|
| Authors: | Kolobe, K.1 kkolobe@fmi.com, Rutter, C.1, Shea, N.1 |
| Source: | Mining Engineering. Jul2022, Vol. 74 Issue 7, p91-92. 2p. |
| Subject Terms: | *Mine ventilation |
| Abstract: | Henderson Mine's primary production transitioned from the main portion of the 7700 level to the 7210 main panel in 2005. On the 7700 level, the southwest (SW) panel was brought into production in 2014 and produced through 2020. A-Panel was brought online in 2019 and took over primary production in 2020. The 7210 north panel is under development with production expected to commence in 2025. The 7700 northwest panel is expected to be the mine's last production panel. [ABSTRACT FROM AUTHOR] |
| Database: | Energy & Power Source |
| FullText | Links: – Type: pdflink Text: Availability: 0 |
|---|---|
| Header | DbId: enr DbLabel: Energy & Power Source An: 158190187 AccessLevel: 6 PubType: Periodical PubTypeId: serialPeriodical PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Transition and optimization of the Henderson mine ventilation system. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Kolobe%2C+K%2E%22">Kolobe, K.</searchLink><relatesTo>1</relatesTo><i> kkolobe@fmi.com</i><br /><searchLink fieldCode="AR" term="%22Rutter%2C+C%2E%22">Rutter, C.</searchLink><relatesTo>1</relatesTo><br /><searchLink fieldCode="AR" term="%22Shea%2C+N%2E%22">Shea, N.</searchLink><relatesTo>1</relatesTo> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Mining+Engineering%22">Mining Engineering</searchLink>. Jul2022, Vol. 74 Issue 7, p91-92. 2p. – Name: Subject Label: Subject Terms Group: Su Data: *<searchLink fieldCode="DE" term="%22Mine+ventilation%22">Mine ventilation</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: Henderson Mine's primary production transitioned from the main portion of the 7700 level to the 7210 main panel in 2005. On the 7700 level, the southwest (SW) panel was brought into production in 2014 and produced through 2020. A-Panel was brought online in 2019 and took over primary production in 2020. The 7210 north panel is under development with production expected to commence in 2025. The 7700 northwest panel is expected to be the mine's last production panel. [ABSTRACT FROM AUTHOR] |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=enr&AN=158190187 |
| RecordInfo | BibRecord: BibEntity: Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 2 StartPage: 91 Subjects: – SubjectFull: Mine ventilation Type: general Titles: – TitleFull: Transition and optimization of the Henderson mine ventilation system. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Kolobe, K. – PersonEntity: Name: NameFull: Rutter, C. – PersonEntity: Name: NameFull: Shea, N. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 07 Text: Jul2022 Type: published Y: 2022 Identifiers: – Type: issn-print Value: 00265187 Numbering: – Type: volume Value: 74 – Type: issue Value: 7 Titles: – TitleFull: Mining Engineering Type: main |
| ResultId | 1 |