Criteria for Extending Preventive Maintenance Plans in Power Substations Using Reliability Block Diagrams.
Saved in:
| Title: | Criteria for Extending Preventive Maintenance Plans in Power Substations Using Reliability Block Diagrams. |
|---|---|
| Authors: | Murad, Carlos Alberto1 (AUTHOR) carlos.murad@usp.br, Michalski, Miguel A. de C.1 (AUTHOR), Kashiwagi, Fabio N.1 (AUTHOR), de Souza, Gilberto F. M.1 (AUTHOR) |
| Source: | Energies (19961073). Jun2026, Vol. 19 Issue 11, p2604. 30p. |
| Subject Terms: | *Electric substations, *Reliability in engineering, *Stochastic processes, *Hazards, *Plant maintenance |
| Abstract: | Maintaining aging equipment is essential for ensuring the reliability and performance of power substations, which are critical components of electric power systems. Preventive maintenance (PM) policies are widely used in this context, but their definition is often based on fixed schedules that do not explicitly account for system degradation and failure dynamics. This paper proposes a structured decision-making framework for evaluating the extension of PM intervals in complex engineering systems. The approach integrates Reliability Block Diagram (RBD) modeling with an imperfect maintenance representation based on the Generalized Renewal Process (GRP) and a Kijima model, allowing the representation of cumulative degradation effects. A decision criterion combining system reliability and the expected number of failures is defined to assess the feasibility of maintenance strategies. The framework is applied to a power substation case study, with emphasis on the transmission line subsystem, considering different PM extension scenarios and parameter uncertainty through sensitivity analysis. The results show that maintenance interval extension must be treated as a constrained problem, in which reductions in maintenance effort must be balanced against increased degradation and failure risk. For the presented case study, only moderate extensions are found to be consistently feasible across all evaluated conditions. The proposed approach provides a systematic and practical method for supporting maintenance planning under uncertainty, enabling consistent and transparent evaluation of maintenance strategies. [ABSTRACT FROM AUTHOR] |
| Database: | Energy & Power Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| FullText | Links: – Type: pdflink Text: Availability: 1 |
|---|---|
| Header | DbId: enr DbLabel: Energy & Power Source An: 194587992 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Criteria for Extending Preventive Maintenance Plans in Power Substations Using Reliability Block Diagrams. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Murad%2C+Carlos+Alberto%22">Murad, Carlos Alberto</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> carlos.murad@usp.br</i><br /><searchLink fieldCode="AR" term="%22Michalski%2C+Miguel+A%2E+de+C%2E%22">Michalski, Miguel A. de C.</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Kashiwagi%2C+Fabio+N%2E%22">Kashiwagi, Fabio N.</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22de+Souza%2C+Gilberto+F%2E+M%2E%22">de Souza, Gilberto F. M.</searchLink><relatesTo>1</relatesTo> (AUTHOR) – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Energies+%2819961073%29%22">Energies (19961073)</searchLink>. Jun2026, Vol. 19 Issue 11, p2604. 30p. – Name: Subject Label: Subject Terms Group: Su Data: *<searchLink fieldCode="DE" term="%22Electric+substations%22">Electric substations</searchLink><br />*<searchLink fieldCode="DE" term="%22Reliability+in+engineering%22">Reliability in engineering</searchLink><br />*<searchLink fieldCode="DE" term="%22Stochastic+processes%22">Stochastic processes</searchLink><br />*<searchLink fieldCode="DE" term="%22Hazards%22">Hazards</searchLink><br />*<searchLink fieldCode="DE" term="%22Plant+maintenance%22">Plant maintenance</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: Maintaining aging equipment is essential for ensuring the reliability and performance of power substations, which are critical components of electric power systems. Preventive maintenance (PM) policies are widely used in this context, but their definition is often based on fixed schedules that do not explicitly account for system degradation and failure dynamics. This paper proposes a structured decision-making framework for evaluating the extension of PM intervals in complex engineering systems. The approach integrates Reliability Block Diagram (RBD) modeling with an imperfect maintenance representation based on the Generalized Renewal Process (GRP) and a Kijima model, allowing the representation of cumulative degradation effects. A decision criterion combining system reliability and the expected number of failures is defined to assess the feasibility of maintenance strategies. The framework is applied to a power substation case study, with emphasis on the transmission line subsystem, considering different PM extension scenarios and parameter uncertainty through sensitivity analysis. The results show that maintenance interval extension must be treated as a constrained problem, in which reductions in maintenance effort must be balanced against increased degradation and failure risk. For the presented case study, only moderate extensions are found to be consistently feasible across all evaluated conditions. The proposed approach provides a systematic and practical method for supporting maintenance planning under uncertainty, enabling consistent and transparent evaluation of maintenance strategies. [ABSTRACT FROM AUTHOR] |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=enr&AN=194587992 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.3390/en19112604 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 30 StartPage: 2604 Subjects: – SubjectFull: Electric substations Type: general – SubjectFull: Reliability in engineering Type: general – SubjectFull: Stochastic processes Type: general – SubjectFull: Hazards Type: general – SubjectFull: Plant maintenance Type: general Titles: – TitleFull: Criteria for Extending Preventive Maintenance Plans in Power Substations Using Reliability Block Diagrams. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Murad, Carlos Alberto – PersonEntity: Name: NameFull: Michalski, Miguel A. de C. – PersonEntity: Name: NameFull: Kashiwagi, Fabio N. – PersonEntity: Name: NameFull: de Souza, Gilberto F. M. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 06 Text: Jun2026 Type: published Y: 2026 Identifiers: – Type: issn-print Value: 19961073 Numbering: – Type: volume Value: 19 – Type: issue Value: 11 Titles: – TitleFull: Energies (19961073) Type: main |
| ResultId | 1 |