School Construction and Normalization. RAS Project: Research in Educational Facilities. A Report.

Saved in:
Bibliographic Details
Title: School Construction and Normalization. RAS Project: Research in Educational Facilities. A Report.
Authors: Corriveau, Gerard-A, Department of Industry, Trade, and Commerce, Ottawa (Ontario).
Peer Reviewed: N
Page Count: 96
Publication Date: 1968
Sponsoring Agency: Montreal Catholic School Commission, (Quebec).
Educational Facilities Labs., Inc., New York, NY.
Descriptors: Architectural Research, Bids, Building Systems, Construction Programs, Controlled Environment, Critical Path Method, Facility Guidelines, Facility Planning, Facility Requirements, Flexible Facilities, Mass Production, Modular Building Design, Performance Specifications, Prefabrication, School Business Relationship, School Construction, Standards, Structural Building Systems
Abstract: This document reports the development of a system of mass-produced standardized components for school construction. The project was originated and implemented to solve a problem connected with the heavy demand for schools that confronted the Montreal Catholic School Board. The report outlines the problem -- a need for schools -- and gives details of the systematic study and research related to user needs that resulted in viable solutions to the problem on the part of 55 industrial firms that formed 11 integrated component construction systems. The means to be employed in solving the problem are detailed both verbally and graphically, showing the derivation of the performance specifications for the five subsystem components to be utilized: (1) structure, (2) heating-ventilating-cooling, (3) ceiling-lighting; (4) partition; and (5) electric-electronic services. An analysis of the solutions submitted indicated that the project goals had been achieved: (1) Reductions in the cost of school construction and in school erecting time; and (2) construction of schools capable of constantly corresponding to the development of education. (Author)
Journal Code: RIEMAR1973
Entry Date: 1973
Accession Number: ED069037
Database: ERIC
FullText Text:
  Availability: 0
CustomLinks:
  – Url: https://eric.ed.gov/contentdelivery/servlet/ERICServlet?accno=ED069037
    Name: ERIC Full Text
    Category: fullText
    Text: Full Text from ERIC
Header DbId: eric
DbLabel: ERIC
An: ED069037
AccessLevel: 3
PubTypeId: unknown
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: School Construction and Normalization. RAS Project: Research in Educational Facilities. A Report.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Corriveau%2C+Gerard-A%22">Corriveau, Gerard-A</searchLink><br /><searchLink fieldCode="AR" term="%22Department+of+Industry%2C+Trade%2C+and+Commerce%2C+Ottawa+%28Ontario%29%2E%22">Department of Industry, Trade, and Commerce, Ottawa (Ontario).</searchLink>
– Name: PeerReviewed
  Label: Peer Reviewed
  Group: SrcInfo
  Data: N
– Name: Pages
  Label: Page Count
  Group: Src
  Data: 96
– Name: DatePubCY
  Label: Publication Date
  Group: Date
  Data: 1968
– Name: SourceSuprt
  Label: Sponsoring Agency
  Group: SrcSuprt
  Data: Montreal Catholic School Commission, (Quebec).<br />Educational Facilities Labs., Inc., New York, NY.
– Name: Subject
  Label: Descriptors
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Architectural+Research%22">Architectural Research</searchLink><br /><searchLink fieldCode="DE" term="%22Bids%22">Bids</searchLink><br /><searchLink fieldCode="DE" term="%22Building+Systems%22">Building Systems</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Programs%22">Construction Programs</searchLink><br /><searchLink fieldCode="DE" term="%22Controlled+Environment%22">Controlled Environment</searchLink><br /><searchLink fieldCode="DE" term="%22Critical+Path+Method%22">Critical Path Method</searchLink><br /><searchLink fieldCode="DE" term="%22Facility+Guidelines%22">Facility Guidelines</searchLink><br /><searchLink fieldCode="DE" term="%22Facility+Planning%22">Facility Planning</searchLink><br /><searchLink fieldCode="DE" term="%22Facility+Requirements%22">Facility Requirements</searchLink><br /><searchLink fieldCode="DE" term="%22Flexible+Facilities%22">Flexible Facilities</searchLink><br /><searchLink fieldCode="DE" term="%22Mass+Production%22">Mass Production</searchLink><br /><searchLink fieldCode="DE" term="%22Modular+Building+Design%22">Modular Building Design</searchLink><br /><searchLink fieldCode="DE" term="%22Performance+Specifications%22">Performance Specifications</searchLink><br /><searchLink fieldCode="DE" term="%22Prefabrication%22">Prefabrication</searchLink><br /><searchLink fieldCode="DE" term="%22School+Business+Relationship%22">School Business Relationship</searchLink><br /><searchLink fieldCode="DE" term="%22School+Construction%22">School Construction</searchLink><br /><searchLink fieldCode="DE" term="%22Standards%22">Standards</searchLink><br /><searchLink fieldCode="DE" term="%22Structural+Building+Systems%22">Structural Building Systems</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: This document reports the development of a system of mass-produced standardized components for school construction. The project was originated and implemented to solve a problem connected with the heavy demand for schools that confronted the Montreal Catholic School Board. The report outlines the problem -- a need for schools -- and gives details of the systematic study and research related to user needs that resulted in viable solutions to the problem on the part of 55 industrial firms that formed 11 integrated component construction systems. The means to be employed in solving the problem are detailed both verbally and graphically, showing the derivation of the performance specifications for the five subsystem components to be utilized: (1) structure, (2) heating-ventilating-cooling, (3) ceiling-lighting; (4) partition; and (5) electric-electronic services. An analysis of the solutions submitted indicated that the project goals had been achieved: (1) Reductions in the cost of school construction and in school erecting time; and (2) construction of schools capable of constantly corresponding to the development of education. (Author)
– Name: CodeSource
  Label: Journal Code
  Group: SrcInfo
  Data: <searchLink fieldCode="JC" term="%22RIEMAR1973%22">RIEMAR1973</searchLink>
– Name: DateEntry
  Label: Entry Date
  Group: Date
  Data: 1973
– Name: AN
  Label: Accession Number
  Group: ID
  Data: ED069037
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=ED069037
RecordInfo BibRecord:
  BibEntity:
    PhysicalDescription:
      Pagination:
        PageCount: 96
    Subjects:
      – SubjectFull: Architectural Research
        Type: general
      – SubjectFull: Bids
        Type: general
      – SubjectFull: Building Systems
        Type: general
      – SubjectFull: Construction Programs
        Type: general
      – SubjectFull: Controlled Environment
        Type: general
      – SubjectFull: Critical Path Method
        Type: general
      – SubjectFull: Facility Guidelines
        Type: general
      – SubjectFull: Facility Planning
        Type: general
      – SubjectFull: Facility Requirements
        Type: general
      – SubjectFull: Flexible Facilities
        Type: general
      – SubjectFull: Mass Production
        Type: general
      – SubjectFull: Modular Building Design
        Type: general
      – SubjectFull: Performance Specifications
        Type: general
      – SubjectFull: Prefabrication
        Type: general
      – SubjectFull: School Business Relationship
        Type: general
      – SubjectFull: School Construction
        Type: general
      – SubjectFull: Standards
        Type: general
      – SubjectFull: Structural Building Systems
        Type: general
    Titles:
      – TitleFull: School Construction and Normalization. RAS Project: Research in Educational Facilities. A Report.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Department of Industry, Trade, and Commerce, Ottawa (Ontario).
      – PersonEntity:
          Name:
            NameFull: Corriveau, Gerard-A
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 01
              Type: published
              Y: 1968
ResultId 1