Construction Management.

Saved in:
Bibliographic Details
Title: Construction Management.
Authors: Abbott, James F., Society for Coll. and Univ. Planning, New York, NY.
Peer Reviewed: N
Page Count: 4
Publication Date: 1971
Report Number: SCUP Journal
v2 n3 pp1-4 Dec 1971
Descriptors: Architects, Architectural Programing, Bids, College Planning, Construction Costs, Construction Management, Construction Programs, Cost Effectiveness, Educational Specifications, Facility Planning, Fast Track Scheduling, Performance Specifications
Abstract: This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction manager's role is summarized, and a detailed list of the services offered by the author's construction management firm is presented. (MLF)
Journal Code: RIEMAY1973
Entry Date: 1973
Accession Number: ED071198
Database: ERIC
FullText Text:
  Availability: 0
Header DbId: eric
DbLabel: ERIC
An: ED071198
AccessLevel: 3
PubTypeId: unknown
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Construction Management.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Abbott%2C+James+F%2E%22">Abbott, James F.</searchLink><br /><searchLink fieldCode="AR" term="%22Society+for+Coll%2E+and+Univ%2E+Planning%2C+New+York%2C+NY%2E%22">Society for Coll. and Univ. Planning, New York, NY.</searchLink>
– Name: PeerReviewed
  Label: Peer Reviewed
  Group: SrcInfo
  Data: N
– Name: Pages
  Label: Page Count
  Group: Src
  Data: 4
– Name: DatePubCY
  Label: Publication Date
  Group: Date
  Data: 1971
– Name: NumberReport
  Label: Report Number
  Group: ID
  Data: SCUP Journal<br />v2 n3 pp1-4 Dec 1971
– Name: Subject
  Label: Descriptors
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Architects%22">Architects</searchLink><br /><searchLink fieldCode="DE" term="%22Architectural+Programing%22">Architectural Programing</searchLink><br /><searchLink fieldCode="DE" term="%22Bids%22">Bids</searchLink><br /><searchLink fieldCode="DE" term="%22College+Planning%22">College Planning</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Costs%22">Construction Costs</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Management%22">Construction Management</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Programs%22">Construction Programs</searchLink><br /><searchLink fieldCode="DE" term="%22Cost+Effectiveness%22">Cost Effectiveness</searchLink><br /><searchLink fieldCode="DE" term="%22Educational+Specifications%22">Educational Specifications</searchLink><br /><searchLink fieldCode="DE" term="%22Facility+Planning%22">Facility Planning</searchLink><br /><searchLink fieldCode="DE" term="%22Fast+Track+Scheduling%22">Fast Track Scheduling</searchLink><br /><searchLink fieldCode="DE" term="%22Performance+Specifications%22">Performance Specifications</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction manager's role is summarized, and a detailed list of the services offered by the author's construction management firm is presented. (MLF)
– Name: CodeSource
  Label: Journal Code
  Group: SrcInfo
  Data: <searchLink fieldCode="JC" term="%22RIEMAY1973%22">RIEMAY1973</searchLink>
– Name: DateEntry
  Label: Entry Date
  Group: Date
  Data: 1973
– Name: AN
  Label: Accession Number
  Group: ID
  Data: ED071198
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=ED071198
RecordInfo BibRecord:
  BibEntity:
    PhysicalDescription:
      Pagination:
        PageCount: 4
    Subjects:
      – SubjectFull: Architects
        Type: general
      – SubjectFull: Architectural Programing
        Type: general
      – SubjectFull: Bids
        Type: general
      – SubjectFull: College Planning
        Type: general
      – SubjectFull: Construction Costs
        Type: general
      – SubjectFull: Construction Management
        Type: general
      – SubjectFull: Construction Programs
        Type: general
      – SubjectFull: Cost Effectiveness
        Type: general
      – SubjectFull: Educational Specifications
        Type: general
      – SubjectFull: Facility Planning
        Type: general
      – SubjectFull: Fast Track Scheduling
        Type: general
      – SubjectFull: Performance Specifications
        Type: general
    Titles:
      – TitleFull: Construction Management.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Society for Coll. and Univ. Planning, New York, NY.
      – PersonEntity:
          Name:
            NameFull: Abbott, James F.
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 12
              Type: published
              Y: 1971
ResultId 1