Construction Management.
Saved in:
| Title: | Construction Management. |
|---|---|
| Authors: | Abbott, James F., Society for Coll. and Univ. Planning, New York, NY. |
| Peer Reviewed: | N |
| Page Count: | 4 |
| Publication Date: | 1971 |
| Report Number: | SCUP Journal v2 n3 pp1-4 Dec 1971 |
| Descriptors: | Architects, Architectural Programing, Bids, College Planning, Construction Costs, Construction Management, Construction Programs, Cost Effectiveness, Educational Specifications, Facility Planning, Fast Track Scheduling, Performance Specifications |
| Abstract: | This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction manager's role is summarized, and a detailed list of the services offered by the author's construction management firm is presented. (MLF) |
| Journal Code: | RIEMAY1973 |
| Entry Date: | 1973 |
| Accession Number: | ED071198 |
| Database: | ERIC |
| FullText | Text: Availability: 0 |
|---|---|
| Header | DbId: eric DbLabel: ERIC An: ED071198 AccessLevel: 3 PubTypeId: unknown PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Construction Management. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Abbott%2C+James+F%2E%22">Abbott, James F.</searchLink><br /><searchLink fieldCode="AR" term="%22Society+for+Coll%2E+and+Univ%2E+Planning%2C+New+York%2C+NY%2E%22">Society for Coll. and Univ. Planning, New York, NY.</searchLink> – Name: PeerReviewed Label: Peer Reviewed Group: SrcInfo Data: N – Name: Pages Label: Page Count Group: Src Data: 4 – Name: DatePubCY Label: Publication Date Group: Date Data: 1971 – Name: NumberReport Label: Report Number Group: ID Data: SCUP Journal<br />v2 n3 pp1-4 Dec 1971 – Name: Subject Label: Descriptors Group: Su Data: <searchLink fieldCode="DE" term="%22Architects%22">Architects</searchLink><br /><searchLink fieldCode="DE" term="%22Architectural+Programing%22">Architectural Programing</searchLink><br /><searchLink fieldCode="DE" term="%22Bids%22">Bids</searchLink><br /><searchLink fieldCode="DE" term="%22College+Planning%22">College Planning</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Costs%22">Construction Costs</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Management%22">Construction Management</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Programs%22">Construction Programs</searchLink><br /><searchLink fieldCode="DE" term="%22Cost+Effectiveness%22">Cost Effectiveness</searchLink><br /><searchLink fieldCode="DE" term="%22Educational+Specifications%22">Educational Specifications</searchLink><br /><searchLink fieldCode="DE" term="%22Facility+Planning%22">Facility Planning</searchLink><br /><searchLink fieldCode="DE" term="%22Fast+Track+Scheduling%22">Fast Track Scheduling</searchLink><br /><searchLink fieldCode="DE" term="%22Performance+Specifications%22">Performance Specifications</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction manager's role is summarized, and a detailed list of the services offered by the author's construction management firm is presented. (MLF) – Name: CodeSource Label: Journal Code Group: SrcInfo Data: <searchLink fieldCode="JC" term="%22RIEMAY1973%22">RIEMAY1973</searchLink> – Name: DateEntry Label: Entry Date Group: Date Data: 1973 – Name: AN Label: Accession Number Group: ID Data: ED071198 |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=ED071198 |
| RecordInfo | BibRecord: BibEntity: PhysicalDescription: Pagination: PageCount: 4 Subjects: – SubjectFull: Architects Type: general – SubjectFull: Architectural Programing Type: general – SubjectFull: Bids Type: general – SubjectFull: College Planning Type: general – SubjectFull: Construction Costs Type: general – SubjectFull: Construction Management Type: general – SubjectFull: Construction Programs Type: general – SubjectFull: Cost Effectiveness Type: general – SubjectFull: Educational Specifications Type: general – SubjectFull: Facility Planning Type: general – SubjectFull: Fast Track Scheduling Type: general – SubjectFull: Performance Specifications Type: general Titles: – TitleFull: Construction Management. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Society for Coll. and Univ. Planning, New York, NY. – PersonEntity: Name: NameFull: Abbott, James F. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 12 Type: published Y: 1971 |
| ResultId | 1 |