An Assessment of the Detroit Public Schools Construction Systems Program.

Saved in:
Bibliographic Details
Title: An Assessment of the Detroit Public Schools Construction Systems Program.
Authors: Featherstone, Richard L., Detroit Public Schools, MI.
Peer Reviewed: N
Page Count: 44
Publication Date: 1972
Descriptors: Architects, Bids, Building Systems, Construction Costs, Construction Management, Construction Programs, Contracts, Cost Effectiveness, Evaluation, Facility Planning, Fast Track Scheduling, Performance Specifications, School Construction, Structural Building Systems, Systems Approach
Abstract: The Construction Systems Program (CSP) is the management process utilized in the construction of additions to four schools in the Detroit School District. The objectives of CSP were (1) to reduce the time required to plan and construct new buildings and additions, (2) to reduce the cost of new buildings and additions, and (3) to maintain or improve the quality of new buildings and additions. This program assessment provides information to aid the members of the Detroit Board of Education in making decisions about future commitments to systems management and systems construction in the building programs. The first part, the introduction, covers term definitions and provides a list of project planners and a report overview. The second, or background section, deals with goals developed by citizens for the School Housing Division and goals for CSP, and describes the organization necessary to goal accomplishment. In the third section, procedures and management, the critical steps taken for the establishment of program direction and the management of the CSP project are discussed. The last section, project outcomes, describes CSP schools and assesses the effectiveness of CSP in relation to the time and cost objectives. A related document is EA 004 753. (Author/MLF)
Entry Date: 1973
Accession Number: ED071201
Database: ERIC
FullText Text:
  Availability: 0
CustomLinks:
  – Url: https://eric.ed.gov/contentdelivery/servlet/ERICServlet?accno=ED071201
    Name: ERIC Full Text
    Category: fullText
    Text: Full Text from ERIC
Header DbId: eric
DbLabel: ERIC
An: ED071201
AccessLevel: 3
PubTypeId: unknown
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: An Assessment of the Detroit Public Schools Construction Systems Program.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Featherstone%2C+Richard+L%2E%22">Featherstone, Richard L.</searchLink><br /><searchLink fieldCode="AR" term="%22Detroit+Public+Schools%2C+MI%2E%22">Detroit Public Schools, MI.</searchLink>
– Name: PeerReviewed
  Label: Peer Reviewed
  Group: SrcInfo
  Data: N
– Name: Pages
  Label: Page Count
  Group: Src
  Data: 44
– Name: DatePubCY
  Label: Publication Date
  Group: Date
  Data: 1972
– Name: Subject
  Label: Descriptors
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Architects%22">Architects</searchLink><br /><searchLink fieldCode="DE" term="%22Bids%22">Bids</searchLink><br /><searchLink fieldCode="DE" term="%22Building+Systems%22">Building Systems</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Costs%22">Construction Costs</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Management%22">Construction Management</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Programs%22">Construction Programs</searchLink><br /><searchLink fieldCode="DE" term="%22Contracts%22">Contracts</searchLink><br /><searchLink fieldCode="DE" term="%22Cost+Effectiveness%22">Cost Effectiveness</searchLink><br /><searchLink fieldCode="DE" term="%22Evaluation%22">Evaluation</searchLink><br /><searchLink fieldCode="DE" term="%22Facility+Planning%22">Facility Planning</searchLink><br /><searchLink fieldCode="DE" term="%22Fast+Track+Scheduling%22">Fast Track Scheduling</searchLink><br /><searchLink fieldCode="DE" term="%22Performance+Specifications%22">Performance Specifications</searchLink><br /><searchLink fieldCode="DE" term="%22School+Construction%22">School Construction</searchLink><br /><searchLink fieldCode="DE" term="%22Structural+Building+Systems%22">Structural Building Systems</searchLink><br /><searchLink fieldCode="DE" term="%22Systems+Approach%22">Systems Approach</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: The Construction Systems Program (CSP) is the management process utilized in the construction of additions to four schools in the Detroit School District. The objectives of CSP were (1) to reduce the time required to plan and construct new buildings and additions, (2) to reduce the cost of new buildings and additions, and (3) to maintain or improve the quality of new buildings and additions. This program assessment provides information to aid the members of the Detroit Board of Education in making decisions about future commitments to systems management and systems construction in the building programs. The first part, the introduction, covers term definitions and provides a list of project planners and a report overview. The second, or background section, deals with goals developed by citizens for the School Housing Division and goals for CSP, and describes the organization necessary to goal accomplishment. In the third section, procedures and management, the critical steps taken for the establishment of program direction and the management of the CSP project are discussed. The last section, project outcomes, describes CSP schools and assesses the effectiveness of CSP in relation to the time and cost objectives. A related document is EA 004 753. (Author/MLF)
– Name: DateEntry
  Label: Entry Date
  Group: Date
  Data: 1973
– Name: AN
  Label: Accession Number
  Group: ID
  Data: ED071201
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=ED071201
RecordInfo BibRecord:
  BibEntity:
    PhysicalDescription:
      Pagination:
        PageCount: 44
    Subjects:
      – SubjectFull: Architects
        Type: general
      – SubjectFull: Bids
        Type: general
      – SubjectFull: Building Systems
        Type: general
      – SubjectFull: Construction Costs
        Type: general
      – SubjectFull: Construction Management
        Type: general
      – SubjectFull: Construction Programs
        Type: general
      – SubjectFull: Contracts
        Type: general
      – SubjectFull: Cost Effectiveness
        Type: general
      – SubjectFull: Evaluation
        Type: general
      – SubjectFull: Facility Planning
        Type: general
      – SubjectFull: Fast Track Scheduling
        Type: general
      – SubjectFull: Performance Specifications
        Type: general
      – SubjectFull: School Construction
        Type: general
      – SubjectFull: Structural Building Systems
        Type: general
      – SubjectFull: Systems Approach
        Type: general
    Titles:
      – TitleFull: An Assessment of the Detroit Public Schools Construction Systems Program.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Detroit Public Schools, MI.
      – PersonEntity:
          Name:
            NameFull: Featherstone, Richard L.
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 01
              Type: published
              Y: 1972
ResultId 1