Construction Management. Educational Facilities Review Series Number 20.
Saved in:
| Title: | Construction Management. Educational Facilities Review Series Number 20. |
|---|---|
| Authors: | Baas, Alan M., ERIC Clearinghouse on Educational Management, Eugene, OR. |
| Peer Reviewed: | N |
| Page Count: | 8 |
| Publication Date: | 1973 |
| Sponsoring Agency: | National Inst. of Education (DHEW), Washington, DC. |
| Contract Number: | OEC-0-8-080353-3514 |
| Descriptors: | Architectural Programing, Building Systems, Construction Costs, Construction Management, Educational Facilities, Fast Track Scheduling, Literature Reviews, Modular Building Design, School Construction, Systems Approach |
| Abstract: | Replacing the general contractor with a "construction manager" directly accountable to the owner promises greatly improved control over cost and scheduling economies. The construction manager should have special skills in construction, cost analysis, critical path method scheduling, and be familiar with the qualifications of local subcontractors. When coordinated with fast-track scheduling (overlapping phases of design and construction that have traditionally occurred end-to-end) and pre-engineered building systems, construction management not only achieves dramatic savings in time and money, but also insures that the completed building meets the objectives for which it was originally intended. This review surveys many recent journals and several documents previously announced in ERIC catalogs pertaining to the conception and application of construction management for school building programs. The majority of the literature surveyed discusses the nature of the construction management team, emphasizing the need for the educator-client to participate directly in the decisionmaking processes of the building program. (Author) |
| Journal Code: | RIEFEB1974 |
| Entry Date: | 1974 |
| Accession Number: | ED082274 |
| Database: | ERIC |
| FullText | Text: Availability: 0 CustomLinks: – Url: https://eric.ed.gov/contentdelivery/servlet/ERICServlet?accno=ED082274 Name: ERIC Full Text Category: fullText Text: Full Text from ERIC |
|---|---|
| Header | DbId: eric DbLabel: ERIC An: ED082274 AccessLevel: 3 PubTypeId: unknown PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Construction Management. Educational Facilities Review Series Number 20. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Baas%2C+Alan+M%2E%22">Baas, Alan M.</searchLink><br /><searchLink fieldCode="AR" term="%22ERIC+Clearinghouse+on+Educational+Management%2C+Eugene%2C+OR%2E%22">ERIC Clearinghouse on Educational Management, Eugene, OR.</searchLink> – Name: PeerReviewed Label: Peer Reviewed Group: SrcInfo Data: N – Name: Pages Label: Page Count Group: Src Data: 8 – Name: DatePubCY Label: Publication Date Group: Date Data: 1973 – Name: SourceSuprt Label: Sponsoring Agency Group: SrcSuprt Data: National Inst. of Education (DHEW), Washington, DC. – Name: NumberContract Label: Contract Number Group: NumCntrct Data: OEC-0-8-080353-3514 – Name: Subject Label: Descriptors Group: Su Data: <searchLink fieldCode="DE" term="%22Architectural+Programing%22">Architectural Programing</searchLink><br /><searchLink fieldCode="DE" term="%22Building+Systems%22">Building Systems</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Costs%22">Construction Costs</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Management%22">Construction Management</searchLink><br /><searchLink fieldCode="DE" term="%22Educational+Facilities%22">Educational Facilities</searchLink><br /><searchLink fieldCode="DE" term="%22Fast+Track+Scheduling%22">Fast Track Scheduling</searchLink><br /><searchLink fieldCode="DE" term="%22Literature+Reviews%22">Literature Reviews</searchLink><br /><searchLink fieldCode="DE" term="%22Modular+Building+Design%22">Modular Building Design</searchLink><br /><searchLink fieldCode="DE" term="%22School+Construction%22">School Construction</searchLink><br /><searchLink fieldCode="DE" term="%22Systems+Approach%22">Systems Approach</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: Replacing the general contractor with a "construction manager" directly accountable to the owner promises greatly improved control over cost and scheduling economies. The construction manager should have special skills in construction, cost analysis, critical path method scheduling, and be familiar with the qualifications of local subcontractors. When coordinated with fast-track scheduling (overlapping phases of design and construction that have traditionally occurred end-to-end) and pre-engineered building systems, construction management not only achieves dramatic savings in time and money, but also insures that the completed building meets the objectives for which it was originally intended. This review surveys many recent journals and several documents previously announced in ERIC catalogs pertaining to the conception and application of construction management for school building programs. The majority of the literature surveyed discusses the nature of the construction management team, emphasizing the need for the educator-client to participate directly in the decisionmaking processes of the building program. (Author) – Name: CodeSource Label: Journal Code Group: SrcInfo Data: <searchLink fieldCode="JC" term="%22RIEFEB1974%22">RIEFEB1974</searchLink> – Name: DateEntry Label: Entry Date Group: Date Data: 1974 – Name: AN Label: Accession Number Group: ID Data: ED082274 |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=ED082274 |
| RecordInfo | BibRecord: BibEntity: PhysicalDescription: Pagination: PageCount: 8 Subjects: – SubjectFull: Architectural Programing Type: general – SubjectFull: Building Systems Type: general – SubjectFull: Construction Costs Type: general – SubjectFull: Construction Management Type: general – SubjectFull: Educational Facilities Type: general – SubjectFull: Fast Track Scheduling Type: general – SubjectFull: Literature Reviews Type: general – SubjectFull: Modular Building Design Type: general – SubjectFull: School Construction Type: general – SubjectFull: Systems Approach Type: general Titles: – TitleFull: Construction Management. Educational Facilities Review Series Number 20. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: ERIC Clearinghouse on Educational Management, Eugene, OR. – PersonEntity: Name: NameFull: Baas, Alan M. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 09 Type: published Y: 1973 |
| ResultId | 1 |