Design-Build in Public School Construction: A Post Hearing Briefing. A Report of the Joint Legislative Audit Committee.
Saved in:
| Title: | Design-Build in Public School Construction: A Post Hearing Briefing. A Report of the Joint Legislative Audit Committee. |
|---|---|
| Language: | English |
| Authors: | California State Legislature, Sacramento. Joint Legislative Audit Committee. |
| Availability: | Web site: http://democrats.assembly.ca.gov/members/a43/jlac.htm (full text). |
| Peer Reviewed: | N |
| Page Count: | 80 |
| Publication Date: | 1998 |
| Intended Audience: | Administrators; Policymakers; Practitioners |
| Document Type: | Collected Works - Proceedings |
| Descriptors: | Administration, Bids, Comparative Analysis, Cost Effectiveness, Design Build Approach, Elementary Secondary Education, Public Schools, School Construction, State School District Relationship |
| Geographic Terms: | California |
| Abstract: | The California legislature's Joint Legislative Audit Committee has issued a report on the design-build versus the design-bid-build process and offers a hybrid approach combining the two systems as a way of achieving the greatest cost efficiency at the least risk on public agencies. The cost benefits of faster delivery of the design-build method may also be attainable in the longer design-bid-build process by making certain potential adjustments to design-bid-build methodology. Examples of these adjustments include: (1) modifying existing law to allow owner selection of pre-qualified general contractors based on the three lowest bids with a percentage cap on the spread between the lowest and highest bids; and (2) allowing for Department of State Architect approval of plans that are "performance" based so that in cases where a firm price is agreed upon, the independently contracted architect/engineer could work collaboratively with the general contractor to design the project's systems. The basic components and competing attributes of both building approaches are examined, including discussions on each method's structure, level of accountability, checks and balances, risk levels, and cost savings. Concluding sections present an analysis for selecting one of these competing systems and recommendations for creating the hybrid system. (GR) |
| Entry Date: | 2000 |
| Accession Number: | ED433681 |
| Database: | ERIC |
| FullText | Text: Availability: 0 CustomLinks: – Url: https://eric.ed.gov/contentdelivery/servlet/ERICServlet?accno=ED433681 Name: ERIC Full Text Category: fullText Text: Full Text from ERIC |
|---|---|
| Header | DbId: eric DbLabel: ERIC An: ED433681 AccessLevel: 3 PubType: Conference PubTypeId: conference PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Design-Build in Public School Construction: A Post Hearing Briefing. A Report of the Joint Legislative Audit Committee. – Name: Language Label: Language Group: Lang Data: English – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22California+State+Legislature%2C+Sacramento%2E+Joint+Legislative+Audit+Committee%2E%22">California State Legislature, Sacramento. Joint Legislative Audit Committee.</searchLink> – Name: Avail Label: Availability Group: Avail Data: Web site: http://democrats.assembly.ca.gov/members/a43/jlac.htm (full text). – Name: PeerReviewed Label: Peer Reviewed Group: SrcInfo Data: N – Name: Pages Label: Page Count Group: Src Data: 80 – Name: DatePubCY Label: Publication Date Group: Date Data: 1998 – Name: Audience Label: Intended Audience Group: Audnce Data: Administrators; Policymakers; Practitioners – Name: TypeDocument Label: Document Type Group: TypDoc Data: Collected Works - Proceedings – Name: Subject Label: Descriptors Group: Su Data: <searchLink fieldCode="DE" term="%22Administration%22">Administration</searchLink><br /><searchLink fieldCode="DE" term="%22Bids%22">Bids</searchLink><br /><searchLink fieldCode="DE" term="%22Comparative+Analysis%22">Comparative Analysis</searchLink><br /><searchLink fieldCode="DE" term="%22Cost+Effectiveness%22">Cost Effectiveness</searchLink><br /><searchLink fieldCode="DE" term="%22Design+Build+Approach%22">Design Build Approach</searchLink><br /><searchLink fieldCode="DE" term="%22Elementary+Secondary+Education%22">Elementary Secondary Education</searchLink><br /><searchLink fieldCode="DE" term="%22Public+Schools%22">Public Schools</searchLink><br /><searchLink fieldCode="DE" term="%22School+Construction%22">School Construction</searchLink><br /><searchLink fieldCode="DE" term="%22State+School+District+Relationship%22">State School District Relationship</searchLink> – Name: Subject Label: Geographic Terms Group: Su Data: <searchLink fieldCode="DE" term="%22California%22">California</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: The California legislature's Joint Legislative Audit Committee has issued a report on the design-build versus the design-bid-build process and offers a hybrid approach combining the two systems as a way of achieving the greatest cost efficiency at the least risk on public agencies. The cost benefits of faster delivery of the design-build method may also be attainable in the longer design-bid-build process by making certain potential adjustments to design-bid-build methodology. Examples of these adjustments include: (1) modifying existing law to allow owner selection of pre-qualified general contractors based on the three lowest bids with a percentage cap on the spread between the lowest and highest bids; and (2) allowing for Department of State Architect approval of plans that are "performance" based so that in cases where a firm price is agreed upon, the independently contracted architect/engineer could work collaboratively with the general contractor to design the project's systems. The basic components and competing attributes of both building approaches are examined, including discussions on each method's structure, level of accountability, checks and balances, risk levels, and cost savings. Concluding sections present an analysis for selecting one of these competing systems and recommendations for creating the hybrid system. (GR) – Name: DateEntry Label: Entry Date Group: Date Data: 2000 – Name: AN Label: Accession Number Group: ID Data: ED433681 |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=ED433681 |
| RecordInfo | BibRecord: BibEntity: Languages: – Text: English PhysicalDescription: Pagination: PageCount: 80 Subjects: – SubjectFull: Administration Type: general – SubjectFull: Bids Type: general – SubjectFull: Comparative Analysis Type: general – SubjectFull: Cost Effectiveness Type: general – SubjectFull: Design Build Approach Type: general – SubjectFull: Elementary Secondary Education Type: general – SubjectFull: Public Schools Type: general – SubjectFull: School Construction Type: general – SubjectFull: State School District Relationship Type: general – SubjectFull: California Type: general Titles: – TitleFull: Design-Build in Public School Construction: A Post Hearing Briefing. A Report of the Joint Legislative Audit Committee. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: California State Legislature, Sacramento. Joint Legislative Audit Committee. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 10 Type: published Y: 1998 |
| ResultId | 1 |