Design-Build in Public School Construction: A Post Hearing Briefing. A Report of the Joint Legislative Audit Committee.

Saved in:
Bibliographic Details
Title: Design-Build in Public School Construction: A Post Hearing Briefing. A Report of the Joint Legislative Audit Committee.
Language: English
Authors: California State Legislature, Sacramento. Joint Legislative Audit Committee.
Availability: Web site: http://democrats.assembly.ca.gov/members/a43/jlac.htm (full text).
Peer Reviewed: N
Page Count: 80
Publication Date: 1998
Intended Audience: Administrators; Policymakers; Practitioners
Document Type: Collected Works - Proceedings
Descriptors: Administration, Bids, Comparative Analysis, Cost Effectiveness, Design Build Approach, Elementary Secondary Education, Public Schools, School Construction, State School District Relationship
Geographic Terms: California
Abstract: The California legislature's Joint Legislative Audit Committee has issued a report on the design-build versus the design-bid-build process and offers a hybrid approach combining the two systems as a way of achieving the greatest cost efficiency at the least risk on public agencies. The cost benefits of faster delivery of the design-build method may also be attainable in the longer design-bid-build process by making certain potential adjustments to design-bid-build methodology. Examples of these adjustments include: (1) modifying existing law to allow owner selection of pre-qualified general contractors based on the three lowest bids with a percentage cap on the spread between the lowest and highest bids; and (2) allowing for Department of State Architect approval of plans that are "performance" based so that in cases where a firm price is agreed upon, the independently contracted architect/engineer could work collaboratively with the general contractor to design the project's systems. The basic components and competing attributes of both building approaches are examined, including discussions on each method's structure, level of accountability, checks and balances, risk levels, and cost savings. Concluding sections present an analysis for selecting one of these competing systems and recommendations for creating the hybrid system. (GR)
Entry Date: 2000
Accession Number: ED433681
Database: ERIC
FullText Text:
  Availability: 0
CustomLinks:
  – Url: https://eric.ed.gov/contentdelivery/servlet/ERICServlet?accno=ED433681
    Name: ERIC Full Text
    Category: fullText
    Text: Full Text from ERIC
Header DbId: eric
DbLabel: ERIC
An: ED433681
AccessLevel: 3
PubType: Conference
PubTypeId: conference
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Design-Build in Public School Construction: A Post Hearing Briefing. A Report of the Joint Legislative Audit Committee.
– Name: Language
  Label: Language
  Group: Lang
  Data: English
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22California+State+Legislature%2C+Sacramento%2E+Joint+Legislative+Audit+Committee%2E%22">California State Legislature, Sacramento. Joint Legislative Audit Committee.</searchLink>
– Name: Avail
  Label: Availability
  Group: Avail
  Data: Web site: http://democrats.assembly.ca.gov/members/a43/jlac.htm (full text).
– Name: PeerReviewed
  Label: Peer Reviewed
  Group: SrcInfo
  Data: N
– Name: Pages
  Label: Page Count
  Group: Src
  Data: 80
– Name: DatePubCY
  Label: Publication Date
  Group: Date
  Data: 1998
– Name: Audience
  Label: Intended Audience
  Group: Audnce
  Data: Administrators; Policymakers; Practitioners
– Name: TypeDocument
  Label: Document Type
  Group: TypDoc
  Data: Collected Works - Proceedings
– Name: Subject
  Label: Descriptors
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Administration%22">Administration</searchLink><br /><searchLink fieldCode="DE" term="%22Bids%22">Bids</searchLink><br /><searchLink fieldCode="DE" term="%22Comparative+Analysis%22">Comparative Analysis</searchLink><br /><searchLink fieldCode="DE" term="%22Cost+Effectiveness%22">Cost Effectiveness</searchLink><br /><searchLink fieldCode="DE" term="%22Design+Build+Approach%22">Design Build Approach</searchLink><br /><searchLink fieldCode="DE" term="%22Elementary+Secondary+Education%22">Elementary Secondary Education</searchLink><br /><searchLink fieldCode="DE" term="%22Public+Schools%22">Public Schools</searchLink><br /><searchLink fieldCode="DE" term="%22School+Construction%22">School Construction</searchLink><br /><searchLink fieldCode="DE" term="%22State+School+District+Relationship%22">State School District Relationship</searchLink>
– Name: Subject
  Label: Geographic Terms
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22California%22">California</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: The California legislature's Joint Legislative Audit Committee has issued a report on the design-build versus the design-bid-build process and offers a hybrid approach combining the two systems as a way of achieving the greatest cost efficiency at the least risk on public agencies. The cost benefits of faster delivery of the design-build method may also be attainable in the longer design-bid-build process by making certain potential adjustments to design-bid-build methodology. Examples of these adjustments include: (1) modifying existing law to allow owner selection of pre-qualified general contractors based on the three lowest bids with a percentage cap on the spread between the lowest and highest bids; and (2) allowing for Department of State Architect approval of plans that are "performance" based so that in cases where a firm price is agreed upon, the independently contracted architect/engineer could work collaboratively with the general contractor to design the project's systems. The basic components and competing attributes of both building approaches are examined, including discussions on each method's structure, level of accountability, checks and balances, risk levels, and cost savings. Concluding sections present an analysis for selecting one of these competing systems and recommendations for creating the hybrid system. (GR)
– Name: DateEntry
  Label: Entry Date
  Group: Date
  Data: 2000
– Name: AN
  Label: Accession Number
  Group: ID
  Data: ED433681
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=ED433681
RecordInfo BibRecord:
  BibEntity:
    Languages:
      – Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 80
    Subjects:
      – SubjectFull: Administration
        Type: general
      – SubjectFull: Bids
        Type: general
      – SubjectFull: Comparative Analysis
        Type: general
      – SubjectFull: Cost Effectiveness
        Type: general
      – SubjectFull: Design Build Approach
        Type: general
      – SubjectFull: Elementary Secondary Education
        Type: general
      – SubjectFull: Public Schools
        Type: general
      – SubjectFull: School Construction
        Type: general
      – SubjectFull: State School District Relationship
        Type: general
      – SubjectFull: California
        Type: general
    Titles:
      – TitleFull: Design-Build in Public School Construction: A Post Hearing Briefing. A Report of the Joint Legislative Audit Committee.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: California State Legislature, Sacramento. Joint Legislative Audit Committee.
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 10
              Type: published
              Y: 1998
ResultId 1