A Report on the Design and Construction of the University of Massachusetts Computer Science Center.
Saved in:
| Title: | A Report on the Design and Construction of the University of Massachusetts Computer Science Center. |
|---|---|
| Language: | English |
| Authors: | Massachusetts State Office of the Inspector General, Boston. |
| Availability: | Massachusetts Office of the Inspector General, P.O. Box 270, State House Station, Boston, MA 02133. Tel: 617-727-9140; Fax: 617-723-2334; Web site: http://www.state.ma.us/ig. For full text: http://www.state.ma.us/ig/igpubl.htm. |
| Peer Reviewed: | N |
| Page Count: | 109 |
| Publication Date: | 2001 |
| Document Type: | Reports - Evaluative |
| Descriptors: | Bids, College Buildings, Construction Costs, Construction Management, Construction (Process), Contracts, Design Build Approach, Educational Facilities, Higher Education |
| Abstract: | This report describes a review conducted by the Massachusetts Office of the Inspector General on the construction of the Computer Science and Development Center at the University of Massachusetts, Amherst. The office initiated the review after hearing concerns about the management of the project, including its delayed completion and substantial cost overruns. The review concluded that the design-build approach used in the building's construction did not produce the anticipated time savings and also fell short of the school's standards for quality in at least two significant ways. Following an executive summary and introduction, the bulk of the report details the review's findings. These are: (1) Although the state's Division of Capital Asset Management (DCAM) used a state statute on modular building procurement to avoid the usual design-bid-build process, the building is not a modular building; (2) Most delays and overruns were caused by factors under the contractor's (Suffolk's) control; (3) The design-build approach was not appropriate for the project; (4) Top DCAM management did not support efforts of DCAM project personnel to enforce contract requirements and maintain control over the project; and (5) Top DCAM management failed to conduct a rigorous assessment of the merits of Suffolk's $2.7 million claim. (An appendix contains a response letter from DCAM). (EV) |
| Entry Date: | 2002 |
| Accession Number: | ED463637 |
| Database: | ERIC |
| FullText | Text: Availability: 0 CustomLinks: – Url: https://eric.ed.gov/contentdelivery/servlet/ERICServlet?accno=ED463637 Name: ERIC Full Text Category: fullText Text: Full Text from ERIC |
|---|---|
| Header | DbId: eric DbLabel: ERIC An: ED463637 AccessLevel: 3 PubType: Report PubTypeId: report PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: A Report on the Design and Construction of the University of Massachusetts Computer Science Center. – Name: Language Label: Language Group: Lang Data: English – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Massachusetts+State+Office+of+the+Inspector+General%2C+Boston%2E%22">Massachusetts State Office of the Inspector General, Boston.</searchLink> – Name: Avail Label: Availability Group: Avail Data: Massachusetts Office of the Inspector General, P.O. Box 270, State House Station, Boston, MA 02133. Tel: 617-727-9140; Fax: 617-723-2334; Web site: http://www.state.ma.us/ig. For full text: http://www.state.ma.us/ig/igpubl.htm. – Name: PeerReviewed Label: Peer Reviewed Group: SrcInfo Data: N – Name: Pages Label: Page Count Group: Src Data: 109 – Name: DatePubCY Label: Publication Date Group: Date Data: 2001 – Name: TypeDocument Label: Document Type Group: TypDoc Data: Reports - Evaluative – Name: Subject Label: Descriptors Group: Su Data: <searchLink fieldCode="DE" term="%22Bids%22">Bids</searchLink><br /><searchLink fieldCode="DE" term="%22College+Buildings%22">College Buildings</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Costs%22">Construction Costs</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Management%22">Construction Management</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+%28Process%29%22">Construction (Process)</searchLink><br /><searchLink fieldCode="DE" term="%22Contracts%22">Contracts</searchLink><br /><searchLink fieldCode="DE" term="%22Design+Build+Approach%22">Design Build Approach</searchLink><br /><searchLink fieldCode="DE" term="%22Educational+Facilities%22">Educational Facilities</searchLink><br /><searchLink fieldCode="DE" term="%22Higher+Education%22">Higher Education</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: This report describes a review conducted by the Massachusetts Office of the Inspector General on the construction of the Computer Science and Development Center at the University of Massachusetts, Amherst. The office initiated the review after hearing concerns about the management of the project, including its delayed completion and substantial cost overruns. The review concluded that the design-build approach used in the building's construction did not produce the anticipated time savings and also fell short of the school's standards for quality in at least two significant ways. Following an executive summary and introduction, the bulk of the report details the review's findings. These are: (1) Although the state's Division of Capital Asset Management (DCAM) used a state statute on modular building procurement to avoid the usual design-bid-build process, the building is not a modular building; (2) Most delays and overruns were caused by factors under the contractor's (Suffolk's) control; (3) The design-build approach was not appropriate for the project; (4) Top DCAM management did not support efforts of DCAM project personnel to enforce contract requirements and maintain control over the project; and (5) Top DCAM management failed to conduct a rigorous assessment of the merits of Suffolk's $2.7 million claim. (An appendix contains a response letter from DCAM). (EV) – Name: DateEntry Label: Entry Date Group: Date Data: 2002 – Name: AN Label: Accession Number Group: ID Data: ED463637 |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=ED463637 |
| RecordInfo | BibRecord: BibEntity: Languages: – Text: English PhysicalDescription: Pagination: PageCount: 109 Subjects: – SubjectFull: Bids Type: general – SubjectFull: College Buildings Type: general – SubjectFull: Construction Costs Type: general – SubjectFull: Construction Management Type: general – SubjectFull: Construction (Process) Type: general – SubjectFull: Contracts Type: general – SubjectFull: Design Build Approach Type: general – SubjectFull: Educational Facilities Type: general – SubjectFull: Higher Education Type: general Titles: – TitleFull: A Report on the Design and Construction of the University of Massachusetts Computer Science Center. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Massachusetts State Office of the Inspector General, Boston. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 03 Type: published Y: 2001 |
| ResultId | 1 |