A Report on the Design and Construction of the University of Massachusetts Computer Science Center.

Saved in:
Bibliographic Details
Title: A Report on the Design and Construction of the University of Massachusetts Computer Science Center.
Language: English
Authors: Massachusetts State Office of the Inspector General, Boston.
Availability: Massachusetts Office of the Inspector General, P.O. Box 270, State House Station, Boston, MA 02133. Tel: 617-727-9140; Fax: 617-723-2334; Web site: http://www.state.ma.us/ig. For full text: http://www.state.ma.us/ig/igpubl.htm.
Peer Reviewed: N
Page Count: 109
Publication Date: 2001
Document Type: Reports - Evaluative
Descriptors: Bids, College Buildings, Construction Costs, Construction Management, Construction (Process), Contracts, Design Build Approach, Educational Facilities, Higher Education
Abstract: This report describes a review conducted by the Massachusetts Office of the Inspector General on the construction of the Computer Science and Development Center at the University of Massachusetts, Amherst. The office initiated the review after hearing concerns about the management of the project, including its delayed completion and substantial cost overruns. The review concluded that the design-build approach used in the building's construction did not produce the anticipated time savings and also fell short of the school's standards for quality in at least two significant ways. Following an executive summary and introduction, the bulk of the report details the review's findings. These are: (1) Although the state's Division of Capital Asset Management (DCAM) used a state statute on modular building procurement to avoid the usual design-bid-build process, the building is not a modular building; (2) Most delays and overruns were caused by factors under the contractor's (Suffolk's) control; (3) The design-build approach was not appropriate for the project; (4) Top DCAM management did not support efforts of DCAM project personnel to enforce contract requirements and maintain control over the project; and (5) Top DCAM management failed to conduct a rigorous assessment of the merits of Suffolk's $2.7 million claim. (An appendix contains a response letter from DCAM). (EV)
Entry Date: 2002
Accession Number: ED463637
Database: ERIC
FullText Text:
  Availability: 0
CustomLinks:
  – Url: https://eric.ed.gov/contentdelivery/servlet/ERICServlet?accno=ED463637
    Name: ERIC Full Text
    Category: fullText
    Text: Full Text from ERIC
Header DbId: eric
DbLabel: ERIC
An: ED463637
AccessLevel: 3
PubType: Report
PubTypeId: report
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: A Report on the Design and Construction of the University of Massachusetts Computer Science Center.
– Name: Language
  Label: Language
  Group: Lang
  Data: English
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Massachusetts+State+Office+of+the+Inspector+General%2C+Boston%2E%22">Massachusetts State Office of the Inspector General, Boston.</searchLink>
– Name: Avail
  Label: Availability
  Group: Avail
  Data: Massachusetts Office of the Inspector General, P.O. Box 270, State House Station, Boston, MA 02133. Tel: 617-727-9140; Fax: 617-723-2334; Web site: http://www.state.ma.us/ig. For full text: http://www.state.ma.us/ig/igpubl.htm.
– Name: PeerReviewed
  Label: Peer Reviewed
  Group: SrcInfo
  Data: N
– Name: Pages
  Label: Page Count
  Group: Src
  Data: 109
– Name: DatePubCY
  Label: Publication Date
  Group: Date
  Data: 2001
– Name: TypeDocument
  Label: Document Type
  Group: TypDoc
  Data: Reports - Evaluative
– Name: Subject
  Label: Descriptors
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Bids%22">Bids</searchLink><br /><searchLink fieldCode="DE" term="%22College+Buildings%22">College Buildings</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Costs%22">Construction Costs</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Management%22">Construction Management</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+%28Process%29%22">Construction (Process)</searchLink><br /><searchLink fieldCode="DE" term="%22Contracts%22">Contracts</searchLink><br /><searchLink fieldCode="DE" term="%22Design+Build+Approach%22">Design Build Approach</searchLink><br /><searchLink fieldCode="DE" term="%22Educational+Facilities%22">Educational Facilities</searchLink><br /><searchLink fieldCode="DE" term="%22Higher+Education%22">Higher Education</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: This report describes a review conducted by the Massachusetts Office of the Inspector General on the construction of the Computer Science and Development Center at the University of Massachusetts, Amherst. The office initiated the review after hearing concerns about the management of the project, including its delayed completion and substantial cost overruns. The review concluded that the design-build approach used in the building's construction did not produce the anticipated time savings and also fell short of the school's standards for quality in at least two significant ways. Following an executive summary and introduction, the bulk of the report details the review's findings. These are: (1) Although the state's Division of Capital Asset Management (DCAM) used a state statute on modular building procurement to avoid the usual design-bid-build process, the building is not a modular building; (2) Most delays and overruns were caused by factors under the contractor's (Suffolk's) control; (3) The design-build approach was not appropriate for the project; (4) Top DCAM management did not support efforts of DCAM project personnel to enforce contract requirements and maintain control over the project; and (5) Top DCAM management failed to conduct a rigorous assessment of the merits of Suffolk's $2.7 million claim. (An appendix contains a response letter from DCAM). (EV)
– Name: DateEntry
  Label: Entry Date
  Group: Date
  Data: 2002
– Name: AN
  Label: Accession Number
  Group: ID
  Data: ED463637
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=ED463637
RecordInfo BibRecord:
  BibEntity:
    Languages:
      – Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 109
    Subjects:
      – SubjectFull: Bids
        Type: general
      – SubjectFull: College Buildings
        Type: general
      – SubjectFull: Construction Costs
        Type: general
      – SubjectFull: Construction Management
        Type: general
      – SubjectFull: Construction (Process)
        Type: general
      – SubjectFull: Contracts
        Type: general
      – SubjectFull: Design Build Approach
        Type: general
      – SubjectFull: Educational Facilities
        Type: general
      – SubjectFull: Higher Education
        Type: general
    Titles:
      – TitleFull: A Report on the Design and Construction of the University of Massachusetts Computer Science Center.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Massachusetts State Office of the Inspector General, Boston.
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 03
              Type: published
              Y: 2001
ResultId 1