APA (7th ed.) Citation

Fawzy, M., Elsaher, R., Chuddher, B. A., & Algohary, G. (2026). Solving the Multi-Skill Resource-Constrained Project Scheduling Problem Considering Skill Depth and Breadth Using ACO Algorithm and LINGO. Algorithms, 19(9), 738. https://doi.org/10.3390/a19090738

Chicago Style (17th ed.) Citation

Fawzy, Mohamad, Raafat Elsaher, Bilal Akbar Chuddher, and Ghada Algohary. "Solving the Multi-Skill Resource-Constrained Project Scheduling Problem Considering Skill Depth and Breadth Using ACO Algorithm and LINGO." Algorithms 19, no. 9 (2026): 738. https://doi.org/10.3390/a19090738.

MLA (9th ed.) Citation

Fawzy, Mohamad, et al. "Solving the Multi-Skill Resource-Constrained Project Scheduling Problem Considering Skill Depth and Breadth Using ACO Algorithm and LINGO." Algorithms, vol. 19, no. 9, 2026, p. 738, https://doi.org/10.3390/a19090738.

Warning: These citations may not always be 100% accurate.