Key technology of pipe jacking construction in low temperature and cold area.
Saved in:
| Title: | Key technology of pipe jacking construction in low temperature and cold area. |
|---|---|
| Authors: | Zhao, Yunfei1, Luo, Feilun1, Wang, Wenxue1, Zhang, Zhengyong1, Xiong, Liang1, Hao, Lijun1, Chen, Shenghua2, Xu, Tianshuo3, Ye, Peng, yepeng@cug.edu.cn |
| Source: | CE/Papers; Mar2025, Vol. 8 Issue 1, p1159-1167, 9p |
| Database: | Applied Science & Technology Source |
| ISSN: | 25097075 |
|---|---|
| DOI: | 10.1002/cepa.3205 |