Application of Direct Current Method and Seismic Wave Method in Advanced Detection of TBM Construction Tunnels.
Saved in:
| Title: | Application of Direct Current Method and Seismic Wave Method in Advanced Detection of TBM Construction Tunnels. |
|---|---|
| Authors: | Zhang, Kai1, Zhang, Yuwen1,2, Zhou, Shungang2,3, Wang, Wei3,4, wang_wei@lreis.ac.cn, Huang, Bin1,4, Zhai, Guansen1,2, Qin, Zeshuai1,3 |
| Source: | Buildings (2075-5309); Sep2025, Vol. 15 Issue 17, p3201, 19p |
| Database: | Applied Science & Technology Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| ISSN: | 20755309 |
|---|---|
| DOI: | 10.3390/buildings15173201 |