Application of Direct Current Method and Seismic Wave Method in Advanced Detection of TBM Construction Tunnels.

Saved in:
Bibliographic Details
Title: Application of Direct Current Method and Seismic Wave Method in Advanced Detection of TBM Construction Tunnels.
Authors: Zhang, Kai1, Zhang, Yuwen1,2, Zhou, Shungang2,3, Wang, Wei3,4, wang_wei@lreis.ac.cn, Huang, Bin1,4, Zhai, Guansen1,2, Qin, Zeshuai1,3
Source: Buildings (2075-5309); Sep2025, Vol. 15 Issue 17, p3201, 19p
Database: Applied Science & Technology Source
Full text is not displayed to guests.
Description
ISSN:20755309
DOI:10.3390/buildings15173201