Research on Integral Splicing Design and Construction Technology for Two Separate Spans of a Prestressed Concrete Continuous Rigid-Frame Bridge.

Saved in:
Bibliographic Details
Title: Research on Integral Splicing Design and Construction Technology for Two Separate Spans of a Prestressed Concrete Continuous Rigid-Frame Bridge.
Authors: Zhong, Chunyao1, Lu, Qiao1,2, Li, Yangfan1, Shi, Xuefei2, shixf@tongji.edu.cn, Song, Jun2, Zhu, Chaoyu2
Source: Buildings (2075-5309); Sep2025, Vol. 15 Issue 17, p3208, 30p
Database: Applied Science & Technology Source
Full text is not displayed to guests.
Description
ISSN:20755309
DOI:10.3390/buildings15173208