Calculation of Buffer Zone Size for Critical Chain of Hydraulic Engineering Considering the Correlation of Construction Period Risk.
Saved in:
| Title: | Calculation of Buffer Zone Size for Critical Chain of Hydraulic Engineering Considering the Correlation of Construction Period Risk. |
|---|---|
| Authors: | Wang, Shengjun1, Ge, Junqiang1,2, Zhang, Jikun2,3, Su, Shengwei1, Hu, Zihang2, Gu, Jianuo3, Nie, Xiangtian3, guanke6023@163.com |
| Source: | Buildings (2075-5309); Feb2026, Vol. 16 Issue 3, p557, 28p |
| Database: | Applied Science & Technology Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| ISSN: | 20755309 |
|---|---|
| DOI: | 10.3390/buildings16030557 |