Calculation of Buffer Zone Size for Critical Chain of Hydraulic Engineering Considering the Correlation of Construction Period Risk.

Saved in:
Bibliographic Details
Title: Calculation of Buffer Zone Size for Critical Chain of Hydraulic Engineering Considering the Correlation of Construction Period Risk.
Authors: Wang, Shengjun1, Ge, Junqiang1,2, Zhang, Jikun2,3, Su, Shengwei1, Hu, Zihang2, Gu, Jianuo3, Nie, Xiangtian3, guanke6023@163.com
Source: Buildings (2075-5309); Feb2026, Vol. 16 Issue 3, p557, 28p
Database: Applied Science & Technology Source
Full text is not displayed to guests.
FullText Links:
  – Type: pdflink
Text:
  Availability: 1
Header DbId: aci
DbLabel: Applied Science & Technology Source
An: 191609143
AccessLevel: 2
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Calculation of Buffer Zone Size for Critical Chain of Hydraulic Engineering Considering the Correlation of Construction Period Risk.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AU" term="%22Wang%2C+Shengjun%22">Wang, Shengjun</searchLink><relatesTo>1</relatesTo><br /><searchLink fieldCode="AU" term="%22Ge%2C+Junqiang%22">Ge, Junqiang</searchLink><relatesTo>1,2</relatesTo><br /><searchLink fieldCode="AU" term="%22Zhang%2C+Jikun%22">Zhang, Jikun</searchLink><relatesTo>2,3</relatesTo><br /><searchLink fieldCode="AU" term="%22Su%2C+Shengwei%22">Su, Shengwei</searchLink><relatesTo>1</relatesTo><br /><searchLink fieldCode="AU" term="%22Hu%2C+Zihang%22">Hu, Zihang</searchLink><relatesTo>2</relatesTo><br /><searchLink fieldCode="AU" term="%22Gu%2C+Jianuo%22">Gu, Jianuo</searchLink><relatesTo>3</relatesTo><br /><searchLink fieldCode="AU" term="%22Nie%2C+Xiangtian%22">Nie, Xiangtian</searchLink><relatesTo>3</relatesTo>, <i>guanke6023@163.com</i>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22Buildings+%282075-5309%29%22">Buildings (2075-5309)</searchLink>; Feb2026, Vol. 16 Issue 3, p557, 28p
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=aci&AN=191609143
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.3390/buildings16030557
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 28
        StartPage: 557
    Titles:
      – TitleFull: Calculation of Buffer Zone Size for Critical Chain of Hydraulic Engineering Considering the Correlation of Construction Period Risk.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Wang, Shengjun
      – PersonEntity:
          Name:
            NameFull: Ge, Junqiang
      – PersonEntity:
          Name:
            NameFull: Zhang, Jikun
      – PersonEntity:
          Name:
            NameFull: Su, Shengwei
      – PersonEntity:
          Name:
            NameFull: Hu, Zihang
      – PersonEntity:
          Name:
            NameFull: Gu, Jianuo
      – PersonEntity:
          Name:
            NameFull: Nie, Xiangtian
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 02
              Text: Feb2026
              Type: published
              Y: 2026
          Identifiers:
            – Type: issn-print
              Value: 20755309
          Numbering:
            – Type: volume
              Value: 16
            – Type: issue
              Value: 3
          Titles:
            – TitleFull: Buildings (2075-5309)
              Type: main
ResultId 1