Design of the head assembly scheme for the pressure-retaining drilling tool of the seafloor drill and analysis of the flow performance of the valve assembly.
Saved in:
| Title: | Design of the head assembly scheme for the pressure-retaining drilling tool of the seafloor drill and analysis of the flow performance of the valve assembly. |
|---|---|
| Authors: | Xu, Zhigang1,2,3, Wang, Jialiang1,2,3, Jialiangwang2019@163.com, Li, Bo1,2,3, Wan, Buyan2,3, Yu, Mengfei2,3, Hu, Siqi1,2,3 |
| Source: | Marine Georesources & Geotechnology; Mar2026, Vol. 44 Issue 3, p723-742, 20p |
| Database: | Applied Science & Technology Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| ISSN: | 1064119X |
|---|---|
| DOI: | 10.1080/1064119X.2025.2527259 |