Calculation Method of Ground Settlement Caused by Mechanical Construction in Metro-Connected Aisle.

Saved in:
Bibliographic Details
Title: Calculation Method of Ground Settlement Caused by Mechanical Construction in Metro-Connected Aisle.
Authors: Duan, Yueqiang1, Wang, Maolei1,2, Wang, Jinghe2,3, lzjtuwangjinghe@163.com, Guo, Yuxiang1,2, Chang, Fa2,3, Zhang, Boyuan2,3, Sun, Weiyu2
Source: Buildings (2075-5309); Apr2026, Vol. 16 Issue 8, p1580, 20p
Database: Applied Science & Technology Source
Full text is not displayed to guests.
Be the first to leave a comment!
You must be logged in first