The ST40 IVC1 divertor project: Procurement and installation in times of COVID-19.
Saved in:
| Title: | The ST40 IVC1 divertor project: Procurement and installation in times of COVID-19. |
|---|---|
| Authors: | Bamber, Rob1 (AUTHOR) robert.bamber@tokamakenergy.co.uk, Iglesias, Daniel1 (AUTHOR), Asunta, Otto1 (AUTHOR), Bunting, Patrick1 (AUTHOR), Daughtry, Steve1 (AUTHOR), Dunbar, Graham1 (AUTHOR), Hanks, Simon1 (AUTHOR), Horozaniecki, Adam1 (AUTHOR), Moore, Peter2 (AUTHOR), Lockley, Damian1 (AUTHOR), Riddle, Kim1 (AUTHOR), Stankiewicz, Marcin1 (AUTHOR), Srawley, Tom1 (AUTHOR), Sykes, Neil2 (AUTHOR), Slade, Rob1 (AUTHOR), Stevens, Simon1 (AUTHOR), Webb, Kevin1 (AUTHOR), Wood, Jon1 (AUTHOR) |
| Source: | Fusion Engineering & Design. Jul2021, Vol. 168, pN.PAG-N.PAG. 1p. |
| Database: | Academic Search Ultimate |
| ISSN: | 09203796 |
|---|---|
| DOI: | 10.1016/j.fusengdes.2021.112378 |