Optimum Scheduling of a Multi-Machine Flexible Manufacturing System Considering Job and Tool Transfer Times without Tool Delay.
Saved in:
| Title: | Optimum Scheduling of a Multi-Machine Flexible Manufacturing System Considering Job and Tool Transfer Times without Tool Delay. |
|---|---|
| Authors: | Prayagi, Sunil1 (AUTHOR) registrar@ycce.edu, Mareddy, Padma Lalitha2 (AUTHOR) mpl@aitsrajampet.ac.in, Katta, Lakshmi Narasimhamu3 (AUTHOR) klsimha@vidyanikethan.edu, Narapureddy, Sivarami Reddy4 (AUTHOR) nsrr@aitsrajampet.ac.in |
| Source: | Mathematics (2227-7390). Oct2023, Vol. 11 Issue 19, p4190. 37p. |
| Database: | Academic Search Ultimate |
|
Full text is not displayed to guests.
Login for full access.
|
|
| ISSN: | 22277390 |
|---|---|
| DOI: | 10.3390/math11194190 |