An improved multi-objective Wild Horse optimization for the dual-resource-constrained flexible job shop scheduling problem: A comparative analysis with NSGA-II and a real case study.
Saved in:
| Title: | An improved multi-objective Wild Horse optimization for the dual-resource-constrained flexible job shop scheduling problem: A comparative analysis with NSGA-II and a real case study. |
|---|---|
| Authors: | Peng, F.1,2, Zheng, L.1 lzheng@mail.tsinghua.edu.cn |
| Source: | Advances in Production Engineering & Management. Sep2023, Vol. 18 Issue 3, p271-287. 17p. |
| Database: | Academic Search Ultimate |
| ISSN: | 18546250 |
|---|---|
| DOI: | 10.14743/apem2023.3.472 |