APA (7th ed.) Citation

Peng, F., & Zheng, L. (2023). An improved multi-objective Wild Horse optimization for the dual-resource-constrained flexible job shop scheduling problem: A comparative analysis with NSGA-II and a real case study. Advances in Production Engineering & Management, 18(3), 271. https://doi.org/10.14743/apem2023.3.472

Chicago Style (17th ed.) Citation

Peng, F., and L. Zheng. "An Improved Multi-objective Wild Horse Optimization for the Dual-resource-constrained Flexible Job Shop Scheduling Problem: A Comparative Analysis with NSGA-II and a Real Case Study." Advances in Production Engineering & Management 18, no. 3 (2023): 271. https://doi.org/10.14743/apem2023.3.472.

MLA (9th ed.) Citation

Peng, F., and L. Zheng. "An Improved Multi-objective Wild Horse Optimization for the Dual-resource-constrained Flexible Job Shop Scheduling Problem: A Comparative Analysis with NSGA-II and a Real Case Study." Advances in Production Engineering & Management, vol. 18, no. 3, 2023, p. 271, https://doi.org/10.14743/apem2023.3.472.

Warning: These citations may not always be 100% accurate.