An improved multi-objective Wild Horse optimization for the dual-resource-constrained flexible job shop scheduling problem: A comparative analysis with NSGA-II and a real case study.
Saved in:
| Title: | An improved multi-objective Wild Horse optimization for the dual-resource-constrained flexible job shop scheduling problem: A comparative analysis with NSGA-II and a real case study. |
|---|---|
| Authors: | Peng, F.1,2, Zheng, L.1 lzheng@mail.tsinghua.edu.cn |
| Source: | Advances in Production Engineering & Management. Sep2023, Vol. 18 Issue 3, p271-287. 17p. |
| Database: | Academic Search Ultimate |
| FullText | Links: – Type: pdflink Text: Availability: 0 |
|---|---|
| Header | DbId: asn DbLabel: Academic Search Ultimate An: 174191924 AccessLevel: 2 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: An improved multi-objective Wild Horse optimization for the dual-resource-constrained flexible job shop scheduling problem: A comparative analysis with NSGA-II and a real case study. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Peng%2C+F%2E%22">Peng, F.</searchLink><relatesTo>1,2</relatesTo><br /><searchLink fieldCode="AR" term="%22Zheng%2C+L%2E%22">Zheng, L.</searchLink><relatesTo>1</relatesTo><i> lzheng@mail.tsinghua.edu.cn</i> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Advances+in+Production+Engineering+%26+Management%22">Advances in Production Engineering & Management</searchLink>. Sep2023, Vol. 18 Issue 3, p271-287. 17p. |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=asn&AN=174191924 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.14743/apem2023.3.472 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 17 StartPage: 271 Titles: – TitleFull: An improved multi-objective Wild Horse optimization for the dual-resource-constrained flexible job shop scheduling problem: A comparative analysis with NSGA-II and a real case study. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Peng, F. – PersonEntity: Name: NameFull: Zheng, L. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 09 Text: Sep2023 Type: published Y: 2023 Identifiers: – Type: issn-print Value: 18546250 Numbering: – Type: volume Value: 18 – Type: issue Value: 3 Titles: – TitleFull: Advances in Production Engineering & Management Type: main |
| ResultId | 1 |