THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take.
Saved in:
| Title: | THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take. |
|---|---|
| Authors: | Davidson, Adam1 |
| Source: | Roads & Bridges. May/Jun2023, Vol. 61 Issue 5, p34-38. 3p. |
| Database: | Academic Search Ultimate |
| ISSN: | 87509229 |
|---|