THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take.
Saved in:
| Title: | THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take. |
|---|---|
| Authors: | Davidson, Adam1 |
| Source: | Roads & Bridges. May/Jun2023, Vol. 61 Issue 5, p34-38. 3p. |
| Database: | Academic Search Ultimate |
| FullText | Links: – Type: pdflink Text: Availability: 0 |
|---|---|
| Header | DbId: asn DbLabel: Academic Search Ultimate An: 175275158 AccessLevel: 2 PubType: Periodical PubTypeId: serialPeriodical PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Davidson%2C+Adam%22">Davidson, Adam</searchLink><relatesTo>1</relatesTo> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Roads+%26+Bridges%22">Roads & Bridges</searchLink>. May/Jun2023, Vol. 61 Issue 5, p34-38. 3p. |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=asn&AN=175275158 |
| RecordInfo | BibRecord: BibEntity: Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 3 StartPage: 34 Titles: – TitleFull: THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Davidson, Adam IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 05 Text: May/Jun2023 Type: published Y: 2023 Identifiers: – Type: issn-print Value: 87509229 Numbering: – Type: volume Value: 61 – Type: issue Value: 5 Titles: – TitleFull: Roads & Bridges Type: main |
| ResultId | 1 |