Interval field model construction of actual bridge with uncertain parameter based on a small number of test samples.
Saved in:
| Title: | Interval field model construction of actual bridge with uncertain parameter based on a small number of test samples. |
|---|---|
| Authors: | Li, Yi-Lin1 (AUTHOR), He, Wen-Yu1,2 (AUTHOR) wyhe@hfut.edu.cn, Ren, Wei-Xin3 (AUTHOR), Hu, Zhi-Xiang1,2 (AUTHOR) |
| Source: | Advances in Structural Engineering. Apr2026, Vol. 29 Issue 5, p925-940. 16p. |
| Database: | Academic Search Ultimate |
|
Full text is not displayed to guests.
Login for full access.
|
|
| ISSN: | 13694332 |
|---|---|
| DOI: | 10.1177/13694332251366715 |