Two-phase optimal and heuristic algorithms for flow shop scheduling with reworks under overlapped queue time limits.
Saved in:
| Title: | Two-phase optimal and heuristic algorithms for flow shop scheduling with reworks under overlapped queue time limits. |
|---|---|
| Authors: | Kim, Hyeon-Il1 (AUTHOR) iehikim@hanyang.ac.kr, Lee, Dong-Ho1 (AUTHOR) leman@hanyang.ac.kr |
| Source: | European Journal of Operational Research. Jul2026, Vol. 332 Issue 2, p376-390. 15p. |
| Database: | Business Source Ultimate |
| ISSN: | 03772217 |
|---|---|
| DOI: | 10.1016/j.ejor.2025.12.048 |