Development of a Construction Waste Management Model Based on Design and Execution Decisions with a Reduce, Reuse, and Recycle (3R) Approach: A Case Study in Sanandaj Using Fuzzy Analytic Network Process (FANP).
Saved in:
| Title: | Development of a Construction Waste Management Model Based on Design and Execution Decisions with a Reduce, Reuse, and Recycle (3R) Approach: A Case Study in Sanandaj Using Fuzzy Analytic Network Process (FANP). |
|---|---|
| Authors: | Ostadnorouzi, Omid1, Aminnejad, Babak2 babak.aminnejad@iau.ac.ir, Lork, Alireza3 |
| Source: | Journal of Resource Management & Decision Engineering. 2025, Vol. 4 Issue 4, p1-9. 9p. |
| Database: | Business Source Ultimate |
| ISSN: | 30419735 |
|---|---|
| DOI: | 10.61838/kman.jrmde.4.4.118 |