Robust CP and PPO-driven matheuristic methods for multi-ship co-dock maintenance scheduling considering uncertainty and limited dock capacity.
Saved in:
| Title: | Robust CP and PPO-driven matheuristic methods for multi-ship co-dock maintenance scheduling considering uncertainty and limited dock capacity. |
|---|---|
| Authors: | Gao, Zheng1,2 (AUTHOR), Dai, Chao3,4 (AUTHOR), Zhang, Liping1,2 (AUTHOR) zhangliping@wust.edu.cn, Zhang, Zikai1,2 (AUTHOR), Li, Zixiang1,2 (AUTHOR), Zhang, Yu1,2 (AUTHOR) |
| Source: | International Journal of Production Research. Jul2026, p1-23. 23p. 7 Illustrations. |
| Database: | Business Source Ultimate |
| ISSN: | 00207543 |
|---|---|
| DOI: | 10.1080/00207543.2026.2702059 |