Robust CP and PPO-driven matheuristic methods for multi-ship co-dock maintenance scheduling considering uncertainty and limited dock capacity.

Saved in:
Bibliographic Details
Title: Robust CP and PPO-driven matheuristic methods for multi-ship co-dock maintenance scheduling considering uncertainty and limited dock capacity.
Authors: Gao, Zheng1,2 (AUTHOR), Dai, Chao3,4 (AUTHOR), Zhang, Liping1,2 (AUTHOR) zhangliping@wust.edu.cn, Zhang, Zikai1,2 (AUTHOR), Li, Zixiang1,2 (AUTHOR), Zhang, Yu1,2 (AUTHOR)
Source: International Journal of Production Research. Jul2026, p1-23. 23p. 7 Illustrations.
Database: Business Source Ultimate
Description
ISSN:00207543
DOI:10.1080/00207543.2026.2702059