THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take.

Saved in:
Bibliographic Details
Title: THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take.
Authors: Davidson, Adam1
Source: Roads & Bridges. May/Jun2023, Vol. 61 Issue 5, p34-38. 3p.
Subjects: Bridge design & construction, Bridges, Central business districts
Abstract: The article focuses on the increasing implementation of Accelerated Bridge Construction (ABC) by Departments of Transportation (DOT) across the U.S., particularly addressing the needs of both rural and urban areas with a significant number of bridges requiring repair or replacement. Topics include key considerations for implementing ABC, examples of successful projects in both rural and urban settings, and a discussion of the pros and cons of using the ABC methodology.
Database: Engineering Source
Description
Abstract:The article focuses on the increasing implementation of Accelerated Bridge Construction (ABC) by Departments of Transportation (DOT) across the U.S., particularly addressing the needs of both rural and urban areas with a significant number of bridges requiring repair or replacement. Topics include key considerations for implementing ABC, examples of successful projects in both rural and urban settings, and a discussion of the pros and cons of using the ABC methodology.
ISSN:87509229