THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take.
Saved in:
| Title: | THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take. |
|---|---|
| Authors: | Davidson, Adam1 |
| Source: | Roads & Bridges. May/Jun2023, Vol. 61 Issue 5, p34-38. 3p. |
| Subjects: | Bridge design & construction, Bridges, Central business districts |
| Abstract: | The article focuses on the increasing implementation of Accelerated Bridge Construction (ABC) by Departments of Transportation (DOT) across the U.S., particularly addressing the needs of both rural and urban areas with a significant number of bridges requiring repair or replacement. Topics include key considerations for implementing ABC, examples of successful projects in both rural and urban settings, and a discussion of the pros and cons of using the ABC methodology. |
| Database: | Engineering Source |
| FullText | Links: – Type: pdflink Text: Availability: 0 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 175275158 AccessLevel: 6 PubType: Periodical PubTypeId: serialPeriodical PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Davidson%2C+Adam%22">Davidson, Adam</searchLink><relatesTo>1</relatesTo> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Roads+%26+Bridges%22">Roads & Bridges</searchLink>. May/Jun2023, Vol. 61 Issue 5, p34-38. 3p. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22Bridge+design+%26+construction%22">Bridge design & construction</searchLink><br /><searchLink fieldCode="DE" term="%22Bridges%22">Bridges</searchLink><br /><searchLink fieldCode="DE" term="%22Central+business+districts%22">Central business districts</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: The article focuses on the increasing implementation of Accelerated Bridge Construction (ABC) by Departments of Transportation (DOT) across the U.S., particularly addressing the needs of both rural and urban areas with a significant number of bridges requiring repair or replacement. Topics include key considerations for implementing ABC, examples of successful projects in both rural and urban settings, and a discussion of the pros and cons of using the ABC methodology. |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=175275158 |
| RecordInfo | BibRecord: BibEntity: Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 3 StartPage: 34 Subjects: – SubjectFull: Bridge design & construction Type: general – SubjectFull: Bridges Type: general – SubjectFull: Central business districts Type: general Titles: – TitleFull: THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Davidson, Adam IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 05 Text: May/Jun2023 Type: published Y: 2023 Identifiers: – Type: issn-print Value: 87509229 Numbering: – Type: volume Value: 61 – Type: issue Value: 5 Titles: – TitleFull: Roads & Bridges Type: main |
| ResultId | 1 |