THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take.

Saved in:
Bibliographic Details
Title: THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take.
Authors: Davidson, Adam1
Source: Roads & Bridges. May/Jun2023, Vol. 61 Issue 5, p34-38. 3p.
Subjects: Bridge design & construction, Bridges, Central business districts
Abstract: The article focuses on the increasing implementation of Accelerated Bridge Construction (ABC) by Departments of Transportation (DOT) across the U.S., particularly addressing the needs of both rural and urban areas with a significant number of bridges requiring repair or replacement. Topics include key considerations for implementing ABC, examples of successful projects in both rural and urban settings, and a discussion of the pros and cons of using the ABC methodology.
Database: Engineering Source
FullText Links:
  – Type: pdflink
Text:
  Availability: 0
Header DbId: egs
DbLabel: Engineering Source
An: 175275158
AccessLevel: 6
PubType: Periodical
PubTypeId: serialPeriodical
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Davidson%2C+Adam%22">Davidson, Adam</searchLink><relatesTo>1</relatesTo>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22Roads+%26+Bridges%22">Roads & Bridges</searchLink>. May/Jun2023, Vol. 61 Issue 5, p34-38. 3p.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Bridge+design+%26+construction%22">Bridge design & construction</searchLink><br /><searchLink fieldCode="DE" term="%22Bridges%22">Bridges</searchLink><br /><searchLink fieldCode="DE" term="%22Central+business+districts%22">Central business districts</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: The article focuses on the increasing implementation of Accelerated Bridge Construction (ABC) by Departments of Transportation (DOT) across the U.S., particularly addressing the needs of both rural and urban areas with a significant number of bridges requiring repair or replacement. Topics include key considerations for implementing ABC, examples of successful projects in both rural and urban settings, and a discussion of the pros and cons of using the ABC methodology.
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=175275158
RecordInfo BibRecord:
  BibEntity:
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 3
        StartPage: 34
    Subjects:
      – SubjectFull: Bridge design & construction
        Type: general
      – SubjectFull: Bridges
        Type: general
      – SubjectFull: Central business districts
        Type: general
    Titles:
      – TitleFull: THE ABC’S OF BRIDGE REPLACEMENT: Determining if accelerated bridge construction is the right route to take.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Davidson, Adam
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 05
              Text: May/Jun2023
              Type: published
              Y: 2023
          Identifiers:
            – Type: issn-print
              Value: 87509229
          Numbering:
            – Type: volume
              Value: 61
            – Type: issue
              Value: 5
          Titles:
            – TitleFull: Roads & Bridges
              Type: main
ResultId 1