Monitoring and Data Analyses of Pressure Changes and Ground Settlements Induced by Slurry TBM Tunneling in a Semiconfined Aquifer: Case Study in the Netherlands.

Saved in:
Bibliographic Details
Title: Monitoring and Data Analyses of Pressure Changes and Ground Settlements Induced by Slurry TBM Tunneling in a Semiconfined Aquifer: Case Study in the Netherlands.
Authors: Xu, Tao1 (AUTHOR) taoxu-hit@hotmail.com, Bezuijen, Adam2 (AUTHOR) adam.bezuijen@ugent.be
Source: Journal of Geotechnical & Geoenvironmental Engineering. Dec2024, Vol. 150 Issue 12, p1-11. 11p.
Subjects: Sustainable construction, Grouting, Water pressure, Aquifers, Tunnel design & construction
Abstract: This paper presents the field monitoring during construction of the Green Heart Tunnel driven by a slurry tunnel boring machine (TBM) in a semiconfined aquifer in which a sand layer was overlaid by a peat layer. Data analyses of the pore-water pressures, slurry pressures, tail-void grout pressures, and ground movements surrounding the tunnel are presented. It was found that the slurry infiltration controls the variation of pore-water pressure only close to the tunnel face. The excess pore-water pressure far from the tunnel face was induced by the elastic storage of the aquifer. It was found that the grouting had little influence on the pore-pressure distribution. Furthermore, because the excess pore-water pressure generated by slurry infiltration might contribute to the grout pressure, the measured value of grout pressure can be smaller than the actual value. Consequently, to obtain the actual value of grout pressure, grout-pressure gauges combined with the pore-pressure transducers should be installed. In the semiconfined aquifer, suction in the overlying peat layer could be induced when the TBM passed through the sand layer. For this condition, the ground movement proportionally increased with the decreasing water pressure. [ABSTRACT FROM AUTHOR]
Copyright of Journal of Geotechnical & Geoenvironmental Engineering is the property of American Society of Civil Engineers and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
Description
Abstract:This paper presents the field monitoring during construction of the Green Heart Tunnel driven by a slurry tunnel boring machine (TBM) in a semiconfined aquifer in which a sand layer was overlaid by a peat layer. Data analyses of the pore-water pressures, slurry pressures, tail-void grout pressures, and ground movements surrounding the tunnel are presented. It was found that the slurry infiltration controls the variation of pore-water pressure only close to the tunnel face. The excess pore-water pressure far from the tunnel face was induced by the elastic storage of the aquifer. It was found that the grouting had little influence on the pore-pressure distribution. Furthermore, because the excess pore-water pressure generated by slurry infiltration might contribute to the grout pressure, the measured value of grout pressure can be smaller than the actual value. Consequently, to obtain the actual value of grout pressure, grout-pressure gauges combined with the pore-pressure transducers should be installed. In the semiconfined aquifer, suction in the overlying peat layer could be induced when the TBM passed through the sand layer. For this condition, the ground movement proportionally increased with the decreasing water pressure. [ABSTRACT FROM AUTHOR]
ISSN:10900241
DOI:10.1061/JGGEFK.GTENG-12434