Bibliographic Details
| Title: |
Project High-Performance Work System for Enabling High-Performing Teams in Construction. |
| Authors: |
Gunathilaka, Sarath1 sarath_gunathilaka@yahoo.com, Wijesekara, Dulanga1, Kwok, Shing Fung1 |
| Source: |
Construction Economics & Building. Dec2025, Vol. 25 Issue 3/4, p43-64. 22p. |
| Subjects: |
High performance work systems, Construction management, Quantitative research, Industrial psychology, Project management, Teams, Organizational structure, Personnel management |
| Abstract: |
Modern construction organizations demand high-performing teams (HPTs) in their projects in order to face increasing performance challenges. On the one hand, they face significant performance challenges due to the competition in the industry in many forms, such as competitive bidding to receive projects. On the other hand, they need to manage the performance challenges posed by the complexities of the uncertain and volatile construction project environment to deliver projects successfully and build up strong organizational profiles to face such issues. At the same time, they must also follow the legislative requirements of their countries, which are focused on the big issues and challenges that exist in the contemporary construction industry. In order to enable HPTs, they need a high-performance work system (HPWS) that can facilitate their projects. However, although literature shows numerous studies on organizational HPWSs that consist of human resource management practices, only limited attention has been given to identifying such a system for the project context. This study aimed to fill this knowledge gap through a quantitative research study. The project high-performance work system (PHPWS) was conceptualized using literature and tested using 221 responses to a questionnaire survey among team members in construction projects. The exploratory factor and confirmatory factor analyses were performed to analyze data to conclude this PHPWS. The findings facilitate the construction organizations to create the PHPWS for enabling HPTs in their projects and constitute a significant original contribution to the theory and practice in the construction management research domain. [ABSTRACT FROM AUTHOR] |
|
Copyright of Construction Economics & Building is the property of University of Technology, Sydney and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) |
| Database: |
Engineering Source |