A new integrated system for loading and scheduling in cellular manufacturing.

Saved in:
Bibliographic Details
Title: A new integrated system for loading and scheduling in cellular manufacturing.
Authors: Saad, Sameh M., Baykasoglu, Adil, Gindy, Nabil N. Z.
Source: International Journal of Computer Integrated Manufacturing. Jan2002, Vol. 15 Issue 1, p37-49. 13p. 3 Color Photographs, 4 Diagrams, 2 Charts, 3 Graphs.
Subjects: Manufacturing cells, Machinery testing, Turbo languages (Computer program language)
Abstract: In this paper, a multiple objective optimization technique, based on simulation, and a taboo search algorithm are proposed for loading and scheduling Cellular Manufacturing systems (CM). Machine independent capability units known as Resource Elements (REs) are used to define the processing capabilities of machines and the processing requirements of parts. The loading problem is formally represented by a Goal Programming formulation with the objectives of system performance measures that are obtained by a simulation-based scheduling system. The problem is solved by a taboo search based algorithm. The proposed integrated system is implemented in C/C++ programming language and simulation. A practical case study is also explained and reported in detail. [ABSTRACT FROM AUTHOR]
Copyright of International Journal of Computer Integrated Manufacturing is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
Description
Abstract:In this paper, a multiple objective optimization technique, based on simulation, and a taboo search algorithm are proposed for loading and scheduling Cellular Manufacturing systems (CM). Machine independent capability units known as Resource Elements (REs) are used to define the processing capabilities of machines and the processing requirements of parts. The loading problem is formally represented by a Goal Programming formulation with the objectives of system performance measures that are obtained by a simulation-based scheduling system. The problem is solved by a taboo search based algorithm. The proposed integrated system is implemented in C/C++ programming language and simulation. A practical case study is also explained and reported in detail. [ABSTRACT FROM AUTHOR]
ISSN:0951192X
DOI:10.1080/09511920110035012