Settling Down.

Saved in:
Bibliographic Details
Title: Settling Down.
Authors: Swallow, Mark A., Halpern, Jack A., Dickey, Michael J.
Source: Civil Engineering (0885-7024). Aug2002, Vol. 72 Issue 8, p52. 6p. 4 Color Photographs, 1 Map.
Subjects: Hydroelectric power plant design & construction, Civil engineering contracts, Mirant Corp.
Geographic Terms: Florida, United States
Abstract: Details the actions taken by the engineers before construction begins on a power plant that will be located next to a reservoir in southern Florida as of August 2002. Terms of the deal between the local government and the Mirant Corporation; Use of an opencut aggregate mine located west of West Palm Beach; Purpose of the power plant; Problem with preloading.
Database: Engineering Source
Full text is not displayed to guests.
Description
Abstract:Details the actions taken by the engineers before construction begins on a power plant that will be located next to a reservoir in southern Florida as of August 2002. Terms of the deal between the local government and the Mirant Corporation; Use of an opencut aggregate mine located west of West Palm Beach; Purpose of the power plant; Problem with preloading.
ISSN:08857024