Settling Down.
Saved in:
| Title: | Settling Down. |
|---|---|
| Authors: | Swallow, Mark A., Halpern, Jack A., Dickey, Michael J. |
| Source: | Civil Engineering (0885-7024). Aug2002, Vol. 72 Issue 8, p52. 6p. 4 Color Photographs, 1 Map. |
| Subjects: | Hydroelectric power plant design & construction, Civil engineering contracts, Mirant Corp. |
| Geographic Terms: | Florida, United States |
| Abstract: | Details the actions taken by the engineers before construction begins on a power plant that will be located next to a reservoir in southern Florida as of August 2002. Terms of the deal between the local government and the Mirant Corporation; Use of an opencut aggregate mine located west of West Palm Beach; Purpose of the power plant; Problem with preloading. |
| Database: | Engineering Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| Abstract: | Details the actions taken by the engineers before construction begins on a power plant that will be located next to a reservoir in southern Florida as of August 2002. Terms of the deal between the local government and the Mirant Corporation; Use of an opencut aggregate mine located west of West Palm Beach; Purpose of the power plant; Problem with preloading. |
|---|---|
| ISSN: | 08857024 |